Rochester Hills
Minutes
Brownfield Redevelopment Authority
Jim Duistermars, George Karas, Stephen McGarry, Thomas Stevenson
Thomas Turnbull, Mark Walterhouse, Suzanne White
7:00 PM
1000 Rochester Hills Drive
Thursday, July 19, 2007
MINUTES of a ROCHESTER HILLS BROWNFIELD REVELOPMENT AUTHORITY 
REGULAR MEETING, held at the Rochester Hills Municipal Offices, 1000 Rochester Hills 
Drive, Rochester Hills, Oakland County, Michigan.
 
CALL TO ORDER
1.
The meeting was called to order by Vice Chairperson Stevenson at 7:00 PM.  
ROLL CALL
2.
 
Suzanne White, George Karas, Thomas Stevenson, Stephen McGarry and 
Thomas Turnbull
Present
5 - 
Jim Duistermars and Mark Walterhouse
Absent
2 - 
Also Present:     Derek Delacourt, Deputy Director, Planning & Development 
Department
          Judy ABialk, Recording Secretary
DETERMINATION OF A QUORUM
3.
Vice Chairperson Stevenson stated a quorum was present.  
APPROVAL OF MINUTES
4.
2007-0433
4A.
Regular Meeting of January 182007
Vice Chairperson Stevenson asked for any comments or changes regarding the 
January 182007 Regular Meeting Minutes.  Upon hearing none, he called for a 
motion.  
A motion was made by  Karas, seconded by  White, that this matter be Approved 
as Presented.  The motion carried by the following vote:
Aye
Turnbull, Stevenson, White, Karas and McGarry
5 - 
Absent
Duistermars and Walterhouse
2 - 
RESOLVED that the Minutes of the January 182007 Regular Brownfield Redevelopment 
Authority Meeting be approved as presented.
ANNOUNCEMENTS/COMMUNICATIONS
5.
Vice Chairperson Stevenson called for any announcements or communications.  No 
announcements or communications were provided.  
PUBLIC COMMENT
6.
Vice Chairperson Stevenson called for any public comments regarding non-Agenda 
related items.  No public comments were received.  
UNFINISHED BUSINESS
7.
 
7A.
2007-0435
Update Regarding Hamlin/Adams Development
MrDelacourt stated he had received a brief update from the City's Environmental 
Consultant, STS Consultants.  He informed the Authority that the applicant had done 
two weeks of investigation, which included two rounds of groundwater sampling and 
two methane samplings from the approximately 12 to 14 wells that were placed on the 
site.  He stated soil samples were taken from approximately 42 test pits on the site in 
areas approved in the initial 381 Work Plan.  He noted the locations had been 
modified slightly based on input from the Michigan Department of Environmental 
Quality (DEQsince the Plan had been approved, but that were very consistent with 
the Plan approved by the Authority prior to the work starting.  
 
MrDelacourt stated that the City had STS Consultants on the site during the entire 
investigation throughout the process observing what AKT Peerless was doing on 
behalf of the applicant.  He noted the City took about Twenty (20%) Percent of the 
sampling material from the site itself and sent those samples to its own independent lab 
to be looked at.  He explained that was part of the agreement in connection with the 
Consent Judgment in relation to the site.  He noted that the results of the samplings 
were not in yet, and the reports should be received in a few weeks.  
 
MrDelacourt explained there were contingency items built into the 381 Work Plan 
based on those samplings for additional work or investigation to be done if the DEQ 
felt it necessary to do additional testing for any contaminate found on the site.  He 
stated he did not know if any of those contingency items would be required or not.  If 
they are, the applicant will go back out to the site; STS Consultants will be there to 
observe, and the same process would be followed until the DEQ, the City and the 
applicant are satisfied with the first round of investigation.  
 
MrDelacourt explained after that, the next step would be for the applicant to put 
together the second phase 381 Work Plan, bring it before the Authority, and begin 
discussions on what would most likely be the remediation phase.  He stated that if it 
became necessary to conduct another round of investigation, there might be another 
interim 381 Work Plan.  He did not think that would be required as flexibility had 
been built into the first 381 Work Plan to cover those contingencies.  He thought it 
likely the next plan to come before the Authority would be the 381 Work Plan that 
covers the initial remediation, if not the full amount of remediation necessary for the 
proposed development.  
 
MrDelacourt stated that when a report or summary of the samples and information 
investigation was received, it would be forwarded to the Authority to review.  Based 
on the report, the Authority could decide if they wanted to have a meeting with STS 
Consultants to review the report or answer any questions.  
 
MrDelacourt stated there had not been any complaints or telephone calls to 9-1-1.  
He explained they had met with the sheriff and fire departments in anticipation of when 
people would be on the site because they would be in chemical suits in the fenced 
area.  He stated they anticipated receiving telephone calls, but that did not happen.  
He noted AKT Peerless seemed to have done their job meticulously and there were 
no complaints.  He indicated there had been one telephone call about a pile of dirt 
within about 20 feet of the fence.  The applicant immediately went out, spread the dirt, 
tarped it, and a routine was established to survey the back fence line at the end of 
each day to make sure there were no erosion concerns.  He stated that was the only 
issue that came up and the process went very smoothly.  
 
MsWhite stated that in the notes from the Environmental Oversight Committee 
meetings, it was indicated they did not know where the source of the methane was 
coming from, and asked if that had been found.  MrDelacourt responded no.  He 
explained it was his understanding that there was a methane hit on one of the wells, 
which was understandable based on what is on the site and the landfill across the 
street.  However, at this point, they have not detected enough methane to 
automatically go back to do more sampling.  He explained when all the sampling was 
done and the DEQ had reviewed the information, they will have a much better idea if 
any additional testing should be done.  He understood they did not find as much as 
they expected, but noted methane was unpredictable because it could be there one 
day and not the next.  He stated they would continue to sample the 12 to 14 wells, 
and explained the wells were designed to sample both groundwater and to sniff for 
methane.  He indicated they would test continuously throughout the process to see if 
the results changed.  At this point two rounds had been done at each, and he was not 
sure how many more they planned to do.  
 
MrKaras asked what had generated the methane concerns from the fill south of 
Hamlin or why was it decided methane was traveling north.  MrDelacourt stated it 
had been apparent, and the DEQ had expressed concern that the former Suburban 
Softball site was generating methane and it was leaving the site.  When that happens, 
he understood they could never be sure where it would go as methane followed the 
path of least resistance.  He explained one day that could be north, and south the next.  
He stated the City and the DEQ had requested methane sampling on the property at 
each test pit site, individually at the well sites, especially along the southern property 
line, to establish if there was methane, to determine if it was being generated from the 
site or from another site and travelling to that site, and that any future development 
puts the appropriate protections in place to ensure those developments cannot be 
impacted by it.  He stated there would be consistent and constant checking for that.  
He clarified they wanted to ensure that no matter where it was coming from, if it is 
finding its way to the property, that the appropriate protections are put in place.  He 
explained that the reason for the testing and one of the contingency items was if it was 
found on the site, they would go back and do more detailed testing.  He noted most of 
the contingencies included in the initial 381 Work Plan were based on methane.  If it is 
found in the initial wells that were in locations selected by the City, the DEQ and the 
applicant, or if they find it in the test pits that they dig, most of the contingency items 
were to go back to do a more thorough methane investigation if the DEQ deems it 
necessary.  
 
MrMcGarry asked if when they were finished with the first results, whether they 
would also provide some of the criteria by which they decide to go back for a more 
detailed investigation or by which they do not do that because they think they are safe.  
MrDelacourt stated that most of the criteria were established in the Work Plan with 
the DEQ prior to going out on the site.  He stated everyone wanted to know if it was 
found, where and how often.  He agreed that once the summary was prepared, if the 
Authority wanted, STS Consultants could update the Authority and explain how those 
determinations were made.  
 
(Arrive Member Duistermars:  7:15 PM)
Jim Duistermars, Suzanne White, George Karas, Thomas Stevenson, 
Stephen McGarry and Thomas Turnbull
Present
6 - 
Mark Walterhouse
Absent
1 - 
Vice Chairperson Stevenson inquired about the relationship between the Authority 
and the Environmental Clean-up & Oversight Technical Review Committee (EOC).  
He commented they seemed to have been deeply involved in the details of the 
projects, further than the Authority had been involved.  He noted that Committee 
reported to City Council.  
 
MrDelacourt explained the current structure of the Committee was three Council 
Members and Staff.  He stated the EOC was created due to the Consent Judgments 
regarding the projects.  He noted there were a lot of decisions and information in 
those Consent Judgments, and the EOC was intended to oversee the process as 
established and to review the projects in remediation in connection with the Consent 
Judgments to ensure that the details were being followed through on by both sides.  
 
MrDelacourt stated that during the EOC meetings, there had been a lot of discussion 
about environmental policy; brownfield policy, or whether to establish a policy, and it 
became apparent to the Committee they wanted more of a connection with the 
Brownfield Authority.  What they were discussing was larger than the two projects 
and the specific requirements of the Consent Judgments, and they needed the input 
from the Authority.  He explained Council had changed the structure of the Committee 
to request that the Brownfield Authority appoint one of its own members to the 
Committee to be a part of that working group and to be a connection between 
Council and the Authority.  This would ensure there was a baseline between the two 
boards on how they would review projects, what was expected of projects, what the 
City wanted to see when projects came forward, and how they would be handled if 
tax increment financing (TIFwould be given.  He noted a brownfield plan had to be 
approved by both boards, and the Committee was looking for a technical working 
group to establish a policy, monitor remediation, and take information back to both 
boards.  
 
Vice Chairperson Stevenson asked if they could expect the EOC Committee to 
continue beyond the existing projects.  MrDelacourt stated the Committee had 
evolved from its original structure, but he did not know whether Council intended to 
keep the Committee or for how long, as that was a Council decision.  
 
MrDuistermars pointed out the ad hoc committee did not have the powers assigned 
to the Authority by Statute, and did not have the purview decide payment schedules 
or other items.  He thought the reason the Committee was established was to ensure 
all the legal agreements contained in the Consent Judgments were met and satisfied.  
He stated the question had come up about future projects, and that still had to be 
defined.  
 
Vice Chairperson Stevenson stated the Committee had discussed the possibility of 
Council establishing a policy.  He was not sure how the Authority fit into that as 
Council established City policies.  
 
MrDelacourt stated an overall brownfield policy for the City should have the 
Authority's input as well as City Council's input.  He explained Staff had considered 
the idea of a policy, and based on the two projects that had come before the City, the 
Committee agreed that idea should be explored further with a view toward a policy or 
an overall city brownfield plan.  He stated the EOC Committee had discussed a 
possible policy that would be adopted by the City and that Staff could use to guide 
applicants.  That way, applicants would know ahead of time what was expected of 
them with respect to submittal requirements and the standards the City would be 
looking for prior to adopting a plan that would be reimbursed through TIF and 
environmental work.  He noted the policy should not be so stringent that the City tied 
its own hands.  For example, a developer could say they met the standards and the 
City must approve them.  
 
MrDelacourt stated Staff had obtained policies and plans from other communities 
and had selected the Ann Arbor Policy as a good example of a policy, which was 
submitted to the EOC to review.  He noted he had asked ASTI Environmental to help 
facilitate the process to create a policy.  He agreed if a policy were established, City 
Council would have to adopt it.  However, the EOC understood that in order for a 
policy to work, it had to be something the Authority and Council agreed to.  He 
pointed out Ann Arbor did not have its own Brownfield Authority, so their policy 
contained references to the Washtenaw County Brownfield Authority.  It was clear in 
the Ann Arbor Policy that even if the County approved a plan, if the designs and 
standards contained in the policy were not met, Ann Arbor would not approve the 
necessary concurring resolutions to move the plan forward with the County.  
 
MrDelacourt stated that MrWackerman had discussed "how clean is cleanand the 
standards, which was what the Authority and the Committee should consider in 
creating at a policy.  It was a question of whether the City established hard-line 
criteria, or what would the City be looking for as far as standards.  He noted the 
discussions about a policy were preliminary at this time.  
 
Vice Chairperson Stevenson thought the City should have a policy for its own sake 
and the sake of developers that could be referred to.  He asked if the City was 
required to have a policy.  
 
MrDelacourt stated that according to the brownfield legislation, it was completely at 
the discretion of the City.  The City did not have to have a reason to say yes, and did 
not have to have a reason to say no, and it was his understanding the City could ask 
for whatever it wanted at any time.  He explained the City was not obligated to 
provide TIF just because something was a brownfield, despite the level or the quality, 
and it was strictly a discretionary item on the City's part.  He stated the Authority had 
as much flexibility as it needed, and the idea of a policy was not to eliminate that 
discretion, but rather to provide some guidance ahead of time and to have a common 
working ground from the beginning and not take every individual project on a 
case-by-case basis trying to work through the requirements.  He thought it would take 
the input of both the Authority and Council to make it work the way it should.  
 
MrKaras noted the Consent Judgments on the two projects affected the City and 
limited the flexibility.  MrDelacourt stated it was unfortunate that the two brownfield 
plans the City had, had been connected to legal actions, which was not the normal 
brownfield process.  He stated the policy would be established for the normal process 
such as a developer coming in with a brownfield plan that was a development that 
conformed to the master plan, that was supported by City Council and the Planning 
Commission, and was something that was an agreed upon situation.  He commented 
the Consent Judgments were different, although the City had more flexibility in some 
cases such as STS Consultants being on the site, which was not something the City 
would normally be entitled to in a regular brownfield plan, but was granted to the City 
through the Consent Judgments.  He noted there were also things in the Consent 
Judgments that the City, residents or City Council probably were not happy with.  He 
hoped that would not become the normal process in brownfield developments.  He 
commented the Consent Judgments did, in some instances, take away some flexibility, 
especially that of the Brownfield Authority.  He explained both Consent Judgments 
indicated the City would provide TIF financing for the remediation if it met all the 
standards of the Act and City Ordinances, and that decision had been taken away 
prior to the Authority reviewing the plans.  
 
MrKaras suggested in setting a policy, the City ought to have a good idea of what 
other landfills are available for development.  He commented that the M-59 corridor 
was important, although there did not appear to be a great interest in School Road or 
other landfill sites.  He thought the City should get a better handle on what sites were 
available for development.  
 
MrDelacourt stated the City's Master Land Use Plan took a step forward in 
identifying those areas, especially School Road, Dequindre and Hamlin, that had 
scattered fill sites and some larger landfills.  The Master Land Use Plan discussed the 
need for the Zoning Ordinance to recognize those and define standards in relation to 
them.  
 
MrDelacourt commented the City had different circumstances than most cities in that 
it does have a large amount of acreage in landfills.  He stated the Brownfield Act was 
not written specifically for landfills.  Rather it was written for older, functionally 
obsolete heavy industrial sites, gas stations, and LUST (Leaking Underground Storage 
Tankssites, noting the City also had those sites as well.  He stated MrKaras was 
right and any policy should take that into account, and some of that work needed to 
be done to evaluate any potential redevelopment and whether the City would be 
willing to provide TIF, and if so, under what circumstances, especially for tough sites 
like landfills.  
 
Vice Chairperson Stevenson noted the Adams and Hamlin site was moving along 
pretty well, and asked at what point the Authority could expect a Reimbursement 
Agreement to be worked out with the developer.  
 
MrDelacourt stated he had called the developer's attorney last week and asked 
when a draft would be provided.  He expected it would be received shortly after the 
first sets of results come in.  He explained that was when they would know if the 
estimates in the Plan itself were accurate, and whether the Plan needed to be 
amended, and they would have a much better idea of the costs associated with the 
redevelopment.  He stated until that point, until they had dollar figures or knew exactly 
what the dollar figures were, there was not too much point in talking about 
reimbursement.  
 
Vice Chairperson Stevenson noted the EOC Committee had discussed the fact the 
site might have more than one 381 Work Plan, probably two, and possibly three, and 
asked for an explanation.  MrDelacourt stated the initial 381 Work Plan had been 
approved by the Authority and the DEQ for the initial investigation.  He explained the 
second would be the plan that outlined what types of systems will be installed, how 
much dirt will be removed, what type of cap, and those things relating to the 
remediation for the actual above ground development.  He stated that if the 
investigation that was recently done caused the City's consultants or the DEQ to ask 
for more investigation than what was identified in the first 381 Work Plan and in the 
contingency items, and the requested additional investigation would not be 
reimbursable because it was not in the approved 381 Work Plan, the applicant would 
prepare an interim or second 381 Work Plan prior to the final one.  He indicated he 
did not anticipate that based on his conversations with STS Consultants, but would 
not know for sure for a couple more weeks.  
 
Vice Chairperson Stevenson asked if the fenced in area would cause the need for 
another 381 Work Plan.  MrDelacourt stated the recent investigation was relatively 
extensive and should cover everything the applicant needed for the remediation 381 
Work Plan, including the fenced area and the entire proposed development.  He 
stated the investigation that was done should be enough to determine what is needed.  
He noted there could be additional samples taken and some additional testing done or 
another well put in, but that was covered under the 381 Work Plan approved by the 
Authority, as that Plan included contingencies with a 20built-in contingency if costs 
go up or down or additional work is necessary.  He indicated the second Work Plan 
should cover the entire site, including the fenced area, which was the area the DEQ 
felt was appropriate to fence back in the late 1990's when the DEQ was on the site.  
 
Vice Chairperson Stevenson asked if the City, the Committee or City Council was at 
risk because of that fenced area.  MrDelacourt responded he did not think the City 
was at any risk for that area.  He posed the question of whether there was a risk the 
contamination was higher than they thought and more remediation would be required 
to do what they wanted to do, and noted the answer was yes.  He asked if by risk, 
the question was that the applicant would come back and say "because of "xy&z"
we're now asking for "xamount in TIF as opposed to what was approved in the 
original brownfield plan,and stated that was a possibility, and pointed out that was a 
possibility with every plan that came in.  
 
Vice Chairperson Stevenson clarified it was up to the developer.  MrDelacourt 
responded yes, as the developer was the one who made the original estimates.  He 
explained the City reviewed the estimates and said the developer's estimates appeared 
to be accurate; however, the developer was responsible if it was wrong.  The 
developer was responsible if it took more time or money up front, that was their risk.  
He stated the developer had to be able to generate enough TIF from the agreed upon 
development to pay back the cost of remediation.  If they cannot do that, that was 
their issue, not the City's.  
 
Vice Chairperson Stevenson asked what the situation would be if the developer 
decided to walk away because they felt it was too much and decided to throw in the 
towel.  MrDelacourt stated the site would be the same as it had been for the last 
twenty years, and if the developer walked away, they would probably put it up for 
sale or sit on it.  He understood that unless the Consent Judgment was vacated, it ran 
with the land, and any potential buyer would be obligated to the same rules and the 
City would still be obligated to its part in the Consent Judgment.  
 
MrKaras asked if the City could require a performance bond.  MrDelacourt stated 
if the developer was going to construct, the City would require performance bonds.  
However, if the developer was not going to build anything, the City could not require 
performance bonds for remediation, as the developer was not obligated to follow 
through with that.  
 
MrKaras clarified the City could not require performance bonds for remediation.  
MrDelacourt responded he did not believe so as he had never heard of that 
happening.  He stated he would look into the matter, but if there was no intent to 
construct, and no TIF would be available for the site, he did not know how the City 
could require them to bond for work that would not be reimbursed by the 
improvement of the site.   
 
MrKaras asked what happened if the developer was half way through remediation, 
or only a quarter of the way through, and decided to stop.  MrDelacourt stated that 
was different.  He stated if they had holes in the ground and had moved dirt, then yes, 
there were requirements the developer complete that.  He was not sure if that was 
through the City or through the DEQ, but there was performance and maintenance 
associated with that.  
 
MrDuistermars thought that situation would be covered in the 381 Work Plan.  He 
stated if they disturbed dirt, and then decided to pull out, they would have to fix what 
they disturbed.  MrDelacourt was not sure if that was done through bonding or an 
agreement with the DEQ, but the developer was not allowed to walk away from open 
contaminants.  He stated he would check to see what the mechanism was to 
accomplish that.  
 
Vice Chairperson Stevenson stated he was more concerned about the Suburban 
Softball site, and asked if anything was happening with that site.  MrDelacourt stated 
the developer had only contacted him once since the end of last year, and that was 
just a cursory call to see if he had heard anything from the DEQ.  He told the 
developer he had not and was waiting to hear from him.  The developer told him they 
were looking at their options on how to go forward with the site and were involved in 
some other sites.  
 
MrDelacourt stated the only other contact that developer had had with the City was 
that their engineer had come in to talk to the City's engineers about general questions 
about sewer capacity.  He explained they were obligated by the Consent Judgment 
that anything they did that the capacity was not there for, they had to build the 
infrastructure at their own cost.  He stated their engineer was trying to get a handle on 
how much capacity there was and what they may or may not have to construct as part 
of any development.  He noted nothing had been submitted to the City, and there had 
not been any meetings held.   
 
Vice Chairperson Stevenson asked if there were any other comments or questions 
regarding this project.  There were no other comments or questions.  
This matter was Discussed
NEW BUSINESS
8.
 
8A.
2007-0434
Appointment of Brownfield Redeveloment Authority Member to the
Environmental Clean-up & Oversight Technical Review Committee
Vice Chairperson Stevenson asked if anyone wanted to volunteer for the Committee.  
 
MrDelacourt pointed out that the Committee met on the first Thursday of each month 
at 9:00 AM.  He stated that City Council had asked the Brownfield Authority to 
appoint one member, who would attend the monthly meetings and provide an update 
to the Authority.  
 
MrKaras stated he was willing to take a crack at it for a term or two.  He stated he 
had read the notes from the EOC meetings and was impressed with what he thought 
was brownfield policy and concerns.  He thought the Authority would be missing a lot 
if they were not aware of what the Committee was doing.  
 
MrDuistermars stated he would nominate MrKaras for the Authority's 
representative on the EOC Committee.  The nomination was seconded by MsWhite.  
 
Vice Chairperson Stevenson called for any other nominations.  Upon hearing none, he 
closed the floor for nominations.  
A motion was made by  Duistermars, seconded by  White, that this matter be 
Approved (unanimously appoint GKaras to EOC Tech CommitteeThe motion 
carried by the following vote:
Aye
Turnbull, Stevenson, White, Karas, Duistermars and McGarry
6 - 
Absent
Walterhouse
1 - 
RESOLVED that George Karas be unanimously appointed as the Brownfield 
Redevelopment Authority's representative on the Environmental Clean-up & Oversight 
Technical Review Committee.
2007-0434
Appointment of Brownfield Redeveloment Authority Member to the
Environmental Clean-up & Oversight Technical Review Committee
Vice Chairperson Stevenson noted for the record that MrKaras had been 
unanimously appointed as the Authority's representative to the EOC Committee.  
DISCUSSION
9.
 
9A.
2007-0436
Discussion Regarding City Brownfield Policy
Vice Chairperson Stevenson noted the Authority thought the policy was important and 
supported the idea.  He stated if he were a developer and came to the City, he would 
sure want to know what he was required to do.  
 
MrDuistermars stated it was also important because if the City did not have a policy, 
everything defaulted to the statutes or what other government regulators said could be 
done.  He noted on the Hamlin/Adams Project, the City was able to obtain a 
combination of different standards, which was a huge benefit to the City.  Without 
that, the City would not have gotten some of the more advanced remediation.  He 
stated having a policy in place would tell everyone up front this is what the City would 
like to have for the City and what the rules were.  
 
Vice Chairperson Stevenson noted the responsibility of writing the policy was City 
Council's.  MrDelacourt explained Staff would work with the EOC and the 
Brownfield Authority, and those boards would do the bulk of the work in reviewing 
the drafts and making the recommendation, and Council would ultimately approve or 
adopt the policy if one is established.  
 
MrMcGarry thought it might be interesting for Council to get a legal opinion about 
the strength of the policy.  He noted the Consent Judgments that were agreed to on 
the two projects, and wondered if the pre-existence of a City policy would take some 
precedence.  
 
MrDuistermars questioned whether the City should have an opinion from the State 
Attorney General.  MrDelacourt stated the City Attorney would review any draft 
before it went to City Council.  
 
Vice Chairperson Stevenson stated he had read the Ann Arbor Policy and thought it 
was tough and very restrictive.  He noted the City would have to decide if they 
wanted to be tough or did the City want to encourage development.  
 
MrDelacourt stated that was toughest decision to make when establishing a policy.  
He commented he had heard different opinions about the Ann Arbor Policy, including 
if it was Ann Arbor's intent to squash any brownfield redevelopment, they had done 
an excellent job of it.  It was his understanding Ann Arbor had only had one real 
project attempted since they put the policy in place several years ago.  He noted if that 
was their intent, and they had decided that was what the reimbursement of TIF dollars 
were worth, that was what they wanted.  
 
MrDelacourt stated that was how the conversation about "how clean is cleanand 
"what the standards weregot started.  He believed a policy was a good idea, but did 
not want the policy to tie the City's hands one way or the other.  He pointed out the 
City had to live with the policy as well.  He stated if there was a very good project the 
City wanted, but the policy stopped the project, would the City have done itself a 
service by putting the policy in place.  He noted those were the types of questions the 
Authority, the EOC and City Council would have to answer, including how stringent 
did the City want to be, how encouraging did the City want to be, and where did the 
City want to fall in that chain when the City establishes the policy.  
 
MrDelacourt stated that discussion would continue over the next several months.  He 
noted Staff would prepare a draft with the assistance of the consultants, and the draft 
would be provided to the Authority and the EOC for review and comment.  He 
indicated the draft would be a proposal, and the two boards would have to discuss 
the standards and what the City wanted.  
 
MrDuistermars thought the Authority could give some direction to Staff.  He stated 
he would like to see a policy for the City that reflected the intent of the Brownfield 
Act, which was to get those properties redeveloped, noting no one was willing to 
clean them up because it was cost prohibitive.  The Act was adopted to encourage 
developers to invest in properties and at the same time benefit the community by 
having a cleaner environment.  He commented if the policy was too restrictive, or the 
City required unreasonable standards, the policy would defeat the purpose of trying to 
get the brownfield sites redeveloped.  
 
Vice Chairperson Stevenson thought the Ann Arbor Policy was very restrictive and 
there were words included in the policy that needed definition, such as "best," "better,
and "more".  He questioned what was actually meant by those terms, and thought that 
should be looked at very carefully and reviewed by the City Attorney.  
 
MrDuistermars stated the first couple brownfield experiences the City had 
encountered had been pretty scary.  He agreed if the policy were too restrictive, it 
would create a situation where it would be too cost-prohibitive to clean up a site 
because the City would not accept certain levels of remediation, which could become 
a problem.  He hoped the policy would be balanced.  
 
Vice Chairperson Stevenson commented the Ann Arbor Policy also contained the 
word "pristineand wondered what that meant and stated it needed to be defined.  
MrDuistermars asked what the method was to get to pristine.  He wondered if 
pristine meant total removal or how well contained something was.  
 
Vice Chairperson Stevenson stated there was a job to do and it was a good idea to 
do that job.  He stated from his point of view, he wanted the developers to want to 
clean up the sites, and he wanted the City to be cleaned up, and he did not want to 
make it impossible for the developers to do that.  He wanted to encourage 
developers, but at the same time, did not want "to give the store away".  
 
MrMcGarry suggested it might be advantageous to have a section in the policy that 
would have some predefined mechanism that stated "in this casethere is a review 
process where the City can make a modification to the standard in a certain case, 
which would allow some flexibility.  He agreed the City should keep the standards 
reasonable, and commented the City would not want to be known as the "easy place 
that does not require much cleanup, and developers can get in and out quickly and 
make a lot of money", but also does not want to stop something that is a good plan.  
 
MrDuistermars stated there should be a mechanism that defined the general 
parameters, but if more issues arose, it could be taken on a case-by-case basis.  He 
noted that was similar to the Steep Slope Ordinance that was just adopted.  If there 
was a problem where a developer thought he might have had his property rights taken 
away, he had a process where he could appeal that.  He thought it was a good idea to 
set the parameters, and if there was anything else that had to be addressed, that was 
where the case-by-case portion kicked in.  
 
MrDelacourt stated the developers' favorite words were "unless otherwise approved 
by".  In other words, the City sets the standards and then includes "unless otherwise 
approved byeither City Council or the Brownfield Authority, which was always a 
possibility.  He noted the authority to make changes was always going to rest with the 
Authority and City Council.  
 
MrDuistermars liked the idea because the policy could define the parameters and 
define the acceptable methods of remediation based on past experience and what 
other communities have observed or experienced.  
 
MrTurnbull asked if there was a reason why the Ann Arbor Policy was brought 
forward as an example.  He stated from his personal background as a developer, he 
would be turned off by something that said "you are at least going to do this or more."  
He noted that was requiring the developer to do the most restrictive response, which 
was not necessarily the best response or not necessarily the best response for the TIF 
dollars.  He stated even if the developer was willing to go to that extent, it was not the 
best use of the money.  
 
MrDelacourt stated the Ann Arbor Policy was used because of the structure of the 
policy, not for the standards or what it says.  
 
MrTurnbull stated the structure was fine, but it was the clean-up standards.  He 
noted the clean-up standards had years of basis in them, and developers had been 
working with them for years.  To include the most restrictive that can be required, 
would not provide the best bang for the buck in most cases.   
 
MrDelacourt stated there was no suggestion that the Ann Arbor standards were the 
ones the City should adopt.  In fact, the standards were not discussed by the EOC in 
relation to Ann Arbor's policy.  He stated the standards should get both the Authority 
and the EOC thinking about what kind of standards the City wanted to see, if there 
are any at all, other than what the DEQ requires.  He stated the Ann Arbor Policy was 
provided more for structure, the process, and the fact it was easy to read.  He noted 
some of the policies were thick and full of legalese and more complicated than a 
convoluted zoning ordinance.  He noted some were simply a one-page document that 
said "you shall submit so many copies, pay such a fee, and the DEQ standards apply".  
He noted the Ann Arbor Policy was just being used an as example, and stated other 
examples could be provided.  
 
Vice Chairperson Stevenson asked if there was any other discussion, or any other 
comments or questions about the possible policy.  None were received.   
This matter was Discussed
ANY OTHER BUSINESS
10.
Vice Chairperson Stevenson called for any other business.  No other business was 
submitted.  
ADJOURNMENT
11.
Vice Chairperson Stevenson stated that the next regular meeting of the Authority was 
scheduled for Thursday, August 162007.  He then called for a motion to adjourn.  
 
Upon a MOTION made by Duistermars, seconded by White, Vice Chairperson 
Stevenson declared the Regular Meeting adjourned at 7:58 PM.  
 
 
 
_________________________________  
Thomas EStevenson, Vice Chairperson
City of Rochester Hills
Brownfield Redevelopment Authority
 
 
_________________________________  
Judy ABialk, Recording Secretary
 
 
 
Approved as presented at the January 172008 Regular Brownfield Redevelopment Authority Meeting