Rochester Hills
Minutes
Planning Commission
Chairperson William Boswell, Vice Chairperson Deborah Brnabic
Members:  Gerard Dettloff, Greg Hooper, Nicholas OKaltsounis, Nathan Klomp, David A
Reece, CNeall Schroeder, Emmet Yukon
7:30 PM
1000 Rochester Hills Drive
Tuesday, April 21, 2009
CALL TO ORDER
Chairperson William Boswell called the Regular Meeting to order at 7:30 
p.min the Auditorium.
ROLL CALL
 
William Boswell, Deborah Brnabic, Gerard Dettloff, Greg Hooper, Nicholas 
Kaltsounis, Nathan Klomp, David Reece, CNeall Schroeder and Emmet 
Yukon
Present
9 - 
APPROVAL OF MINUTES
2009-0147
February 172009 Regular Meeting
 
A motion was made by Schroeder, seconded by Klomp, that this matter be 
Approved as Presented.                                                                                                                                                                                             
The motion CARRIED by the following vote:
Aye
Boswell, Brnabic, Dettloff, Hooper, Kaltsounis, Klomp, Schroeder and 
Yukon
8 - 
Abstain
Reece
1 - 
COMMUNICATIONS
A)  Letter from First State Bank, dated April 212009 re:  Grace Parc
B)  Planning & Zoning News (2dated February and March, 2009
NEW BUSINESS
2007-0221
Request for Recommendation of an additional Extension of the Tentative 
Preliminary Plat, until April 202010, for Grace Parc, a 16-lot subdivision located 
north of South Boulevard between Livernois and Rochester Roads, zoned R-4
Grace Street Development, applicant.
(Reference:  Memo prepared by Ed Anzek, dated April 17
2009 had been placed on file and by reference became part 
of the record thereof.)
 
Present for the applicant was Franco Mancini, Grace Street 
Development, 47858 Van Dyke, Suite 410, Shelby 
Township, MI 48317.
 
MrMancini introduced himself as the applicant present on 
behalf of Grace Street Development and First State Bank, 
24300 Little Mack, StClair Shores, MI 48080.            
 
MrAnzek advised that the request was for a fourth 
Extension of the Tentative Preliminary Plat.  It was brought 
to his attention late in the day that the property was 
foreclosed upon in October 2008.  Staff was not aware of 
that, and he contacted MrMancini immediately, and it was 
confirmed.  MrMancini told him that the bank permitted 
him to go forward with the approval process, and to keep it 
active so they would be in a good position when the 
recession ended.  Another issue was the new engineering 
standards adopted last year, of which MrMancini was 
aware.  The Engineering Department looked at the plans, 
and it appeared that the standards would affect the 
developments layout.  It was suggested by MrPaul Davis, 
the City Engineer, that if the applicant completed the 
construction plan documents prior to getting Final 
Preliminary Plat approval, the Planning Commission would 
be able to review the (possibly revisedPlat after the 
engineering standards were applied.  
 
Chairperson Boswell asked MrAnzek if he had called First 
State Bank.  MrAnzek said he only received the fax very 
late in the day, and he did not have a chance to discuss it 
with the bank or the City Attorney.  He indicated that from 
his experience, it was not unusual for a bank to want a 
project to stay active to try to recover its investment.  
 
Chairperson Boswell asked MrMancini if he had anything 
to add, and he responded that MrAnzek was correct.  They 
were in a workout” process with the bank.  
 
MrDettloff asked if the request was coming from the bank 
via MrMancini, which was confirmed.  He asked if the 
Extension would be granted to the bank.  MrAnzek said he 
had not been able to confirm that.  MrDettloff said that he 
hoped things would settle down during the course of the 
year, and that MrMancini would get the property back and 
be able to move forward.   He asked MrMancini if he knew 
who would be getting the Extension, and he replied that 
technically, he would be, but that he was also representing 
the bank.  MrDettloff asked what was being seen out there, 
and if there was a light at the end of the tunnel.  MrMancini 
said it was still pretty gloomy, but they were seeing 
progress and a stabilization of foreclosures, and he advised 
that he had numerous projects on hold.  The banks had 
halted a lot of the financing, and that had put developers in 
a precarious situation.  They were looking at new 
partnerships as well.  
 
MrKaltsounis indicated that they were not really clear 
about the ownership of the property, based upon the 
foreclosure.   He recommended that the matter be 
postponed until the City Attorney could be contacted.  He 
was concerned that they were not prepared for a different 
realm.  
 
Chairperson Boswell agreed.  He would not have a problem 
granting an Extension, but since it was just made known, he 
would like to give Staff time to speak with the bank and the 
City Attorney.
 
MrAnzek added that there would be no problem with 
regards to the timeframe.  MrMancini had requested the 
Extension in time, and in previous situations, MrStaran 
had advised that the clock stopped running at that point.  If 
there were additional inquiries Staff needed to do, there 
would not be a concern regarding the timeframe.  It would 
not impede MrMancini or the process; it would just delay 
the approval or denial.  He said he would like to have a 
discussion with MrStaran to see if all that was needed was 
a letter from the bank authorizing MrMancini.  
 
MrMancini agreed it was short notice, and said that he did 
not really relish driving a long way to get a formal letter.  He 
suggested that it could be made a Condition of approval, to 
give MrAnzek time to confer with the bank and to save him 
a few extra trips, but he said it was not a problem.
 
MrAnzek noted that the Ordinance stated that the owner of 
the property had to submit the request.  MrKaltsounis 
moved the following motion:
 
Motion by Kaltsounis, seconded by Yukon, that in the 
matter of City File No04-011 (Grace Parc Subdivision), the 
Planning Commission postpones the request for an 
Extension until such time that Staff has had an appropriate 
discussion with the owner of the property (First State Bank
and the City Attorney.
 
Chairperson Boswell had received one card, and he called 
the speaker forward for public comment.
 
Vickie Bellinger, 430 Grace Ave., Rochester Hills, MI  
48309.  MsBellinger thanked the City for sending a notice 
of the meeting.  She advised that she was a resident that 
abutted the proposed development.  She questioned 
whether the Extension was being requested by the City or 
by MrMancini or the bank, which now owned the property.  
She believed that it was through her husband that the City 
was made aware the property was owned by the bank.  She 
thought it was confusing that MrMancini was speaking for 
them.  She said that the Grace Parc plan was one that the 
residents and the developer agreed to after multiple 
meetings.  She thought it was a good exercise, and it was a 
compromise from what the developer had originally 
planned, to a plan that was more acceptable to the 
residents, and she appreciated that effort.  She was not 
convinced it was the best plan; there were other plans, but 
the developer did not want to take the time to make them 
work.  It would have required cooperation between two 
developers, which was not always easy.  She commented 
that the development was done in a hurry, but it did not 
result in a ground breaking.  Now that the property had 
reverted to the bank, she said that she would expect they 
were looking at a new developer or new alliance.  She 
would prefer to see other ideas given consideration.  She 
would vote for a plan that the residents were interested in, 
and where there would be more winners.  She did not see 
any benefit to the residents to approve a fourth Extension 
with the change in circumstances.  If it had not changed 
hands, they would not have much to say.  It would help the 
bank with marketing, but she felt the interest of the 
residents should also be considered, particularly since it 
had taken years.   She said that she came to the meeting to 
share her thoughts, but said it would be helpful to hear from 
those who previously worked on the compromise, i.e., a 
group of the neighbors, and she would appreciate it if the 
matter could be deferred, which she then agreed had 
happened.  If Grace Parc were going forward, the residents’ 
input would be worthy of consideration.  She was endorsing 
what the Commission had done, and she would be 
interested in what the other residents thought about a fourth 
Extension.
 
Chairperson Boswell closed the public comments and 
recapped that in the intervening years, there had been 
some changes to the Citys engineering standards, which 
would have to be met.  That meant that there could be 
some fairly significant changes to the plat.   
 
MrAnzek agreed, and said that the Engineer thought there 
would be significant changes.  Chairperson Boswell 
suggested that would give the neighbors another 
opportunity to look at things and bring forth suggestions.  
MrAnzek said that the notices went out to people who 
spoke at the previous meetings or put their name on the 
mailing list, and each time the matter came up, those 
people would be notified.  
 
Hearing no further discussion, Chairperson Boswell read 
the motion and called for a vote.
A motion was made by Kaltsounis, seconded by Yukon, that this matter be 
Postponed.                                                                                                                                                                                             
The motion CARRIED by the following vote:
Aye
Boswell, Brnabic, Dettloff, Hooper, Kaltsounis, Klomp, Schroeder and 
Yukon
8 - 
Abstain
Reece
1 - 
Chairperson Boswell stated for the record that the motion 
had passed unanimously.
 
2009-0146
2010 2015 Capital Improvement Plan Workshop 
Presentation of Projects
MrAnzek recapped that a workshop was conducted each 
year in April to present the new CIP projects, and that it was 
the 12th year the City had prepared a CIP.  The project 
sponsors were asked to represent their projects, and he 
noted that MrRousse of Engineering Services was present.  
MrAnzek stated that the CIP process was very important, 
and that it had served the City considerably.  The Policy 
team identified all wants, needs, potential wear-outs, and 
things that needed repairing.  There were policies in the 
document that identified the dollar amounts for capital 
improvement projects.  The Policy Team, consisting of two 
Planning Commissioners, one City Council member and 
four Staff members, met initially in January.  The Team 
revisited the policies, determined the grading factors, and 
looked at the return on investment and other factors.  They 
put out a call for projects on the web and throughout the 
City but none were submitted from the outside.  He noted 
that last year, numerous projects had been completed.   He 
introduced Keith Sawdon, the Citys new Finance Director, 
who had previously worked for the City from 1986 to 1994 
before going to the County.  
 
MrAnzek referred to page 92, Projects Added, and briefed 
the Commissioners on each.  (The 2010-2015 CIP draft 
was placed on file, and by reference became a part of the 
record thereof).   He went down the list:  SW-02B, Hamlin 
Court Drainage Improvements, which was for a gravel road 
needing work east of Livernois; SW-03B, Karas Creek Bank 
Stabilization, was being done in conjunction with the 
Hamlin Road improvements; SW-06B, Bendelow Road 
Ditching, was for improvements to another gravel road on 
the east side of the road (west side had been done during 
construction of Country Club Village); SW-09B, Storm Water 
BMP Retrofit the City wanted to lead by example and 
perform best management practices City-wide to reduce 
surface runoff and water pollution.  It was part of the policy 
of going green.”  Next was PW-08E, Tienken Pathway:  
Historic District (Van Hoosen-Washington) - there were 
ongoing discussions regarding the Tienken Road corridor 
and upcoming meetings about improvements to that 
corridor.  MR-03B, LDFA Concrete & Asphalt Rehab 
Program:  Funds were captured via tax increment financing 
and the monies would be used for roads within the LDFA 
district.  MR-05E, Adams Road Rehab (South Boulevard to 
Auburn Rd.):  An overlay with drainage improvements.  
MR-05F, Adams Boulevard Irrigation:  It would be for a 
portion of the newly realigned Adams from north of Walmart 
to north of Hamlin where it tapered back to two lanes.  
MR-05G, Adams Road at Tienken Road Intersection 
Improvements, no detail given; MR-21, East Nawakwa 
Road Rehab from the southern entrance into Country Club 
Village westward toward Rochester Rd.  MR-24C, Brewster 
Road Right-Turn Lane Extension at Walton Boulevard:  
They would extend the right turn lane further northward, 
allowing more cars to stack for a right turn westbound onto 
Walton.  MR-27, Major Road Bridge Rehab Program:  The 
City owns four bridges and this was a program to do a 
bi-annual inspection and repairs as necessary.  MR-31D, 
John R Road at Hamlin Road Traffic Signal Upgrade:  The 
signal was scheduled to be changed from a cross section 
to a box-span.  MR-40B, Tienken Road Bridge 
Replacement at Stoney Creek:  The project was getting a 
lot of attention, and there have been questions about what 
would be done to Tienken, how wide the bridge would be 
and how it would affect the Historic District.  WS-25B, South 
Boulevard Water Main Replacement and WS-42A, M-59 
Water Main Replacement were self explanatory, and he 
advised that the second was being done with the 
anticipated widening of M-59.  SS-01B, SCADA System 
Enhancement:  He explained that SCADA was the City
water control system that the mains were remotely tied to, 
and it alerted Staff if there was a water main break or other 
problems.  SS-30, Sanitary Sewer Easement Machine:  
This would allow crews to get into tighter areas to do 
repairs.  SS-31, Small Vactor System was pretty much the 
same thing; a smaller machine to do repairs in between 
homes, for example.  FA-01G, City Hall LED Light Upgrade:  
The City conducted an audit of energy usage, and it 
showed that if the lights were changed to LEDs, much less 
electricity would be used.  FA-02E, Communication Center 
Phones Upgrade it was for a fire station.  FA04-B, Old DPS 
Garage Conversion to Cold Storage Facility:  A partial 
knockdown and cleanout of the old building to be used for 
storage.  FA-04C, Salt Storage Facility Upgrade also at the 
DPS facility.  FA-04D, DPS Fuel Dispenser Replacement 
(self-explanatory); FA-10, Energy Efficiency Analysis:  To 
find the best way to implement practices determined from 
the energy audit; PS-14B, LDFA Master Infrastructure Plan:  
It was submitted by Planning and Development.  After the 
LDFA was established, there was a Master Plan prepared 
in 1996, which identified what infrastructure needed to be 
redone and when.  The LDFA was primarily established to 
generate funds for the Adams Rdproject.  The City was 
now obligated to spend the monies in support of the LDFA 
capture area to hopefully attract and keep businesses.  
They needed to come up with a second generation Master 
Plan for that area.  Lastly, IS-11, City-wide Two-Way Radio 
Changeover:  Replacement of outdated radio equipment to 
comply with new Federal mandates
 
MrAnzek concluded the introduction of new projects, and 
reminded that it was critical that the CIP be approved in 
May, so MrSawdon could then prepare documents for the 
Mayor.  The budget had to be presented to City Council in 
early August.  
 
MsBrnabic referred to the John R/Hamlin Rdtraffic signal, 
and asked if was being done because it was mandatory 
due to ADA requirements or if the City just felt it was a 
needed upgrade.  MrRousse said that John R was a 
City-owned road, and that was why the Citys share was 
100%.  The box band had dual lights over each lane, the 
upgrade would improve visibility, and they would install 
LED lights and upgrade the whole intersection.  MsBrnabic 
wondered if the expense was necessary in light of the 
economy.  MrRousse said that it was not mandatory; it 
was suggested based on traffic conditions to improve the 
intersection.  MsBrnabic asked if there had been traffic 
problems, noting that she travelled the area quite a bit and 
she had not personally noticed any.  MrRousse explained 
that signals did wear out from time to time and when they 
repaired this one, they would like to upgrade it to the box 
band type.  It was part of the Best Management Practices of 
traffic control using the latest technology.  MsBrnabic said 
she understood that, but she questioned the expense at this 
place and time in the economy, and that was why she had 
asked if it was mandatory.
 
MrSchroeder referred to WS-42A, and noted that they 
planned an eight-inch watermain under M-59He 
maintained that the minimum size for a watermain under 
any public roadway should be 12-inches.  It did not make 
sense to him to replace a line under M-59 with an eight-inch 
line, when the difference in cost was nominal.  The labor 
would not be any different, and he strongly recommended 
that it be changed to a 12-inch because in the future, if they 
needed more, they would not have it.  MrRousse agreed it 
could be accomplished.
 
MrDettloff asked if, other than the M-59 project, any other 
projects would potentially qualify for the stimulus funding.  
MrRousse said that all the energy projects would qualify if 
they were submitted in a timely manner and with enough 
detail.  They were in the process of compiling the Rebuild 
Michigan, a free program where an analyst looks at the 
consumption of energy in the Citys buildings and makes 
some recommendations, such as installing LED lighting 
and modifying the temperature policy.  The application was 
due in June, and they were compiling the cost information 
for all the buildings and planned to submit it.  
 
MrAnzek noted that when the first stimulus package was 
made available, it was for highways and roads.  The State 
asked for projects, and the City worked closely with 
Congressman Peters’ office and submitted about $450 
million in projects.  There was about $57 billion in projects 
submitted for the initial funding throughout the State.  The 
City tried to get money for local roads, drain improvements 
or anything they could, but local roads were discounted 
right off the top.  The widening of M-59 was identified by 
MDOT and would begin this year.  They also were trying to 
get money for the Crooks Road interchange, and the City 
has been working with Troy and Rochester in a concerted 
effort to lobby for funds.  He stressed that it was important 
be positioned for the second wave of stimulus money.
 
MrDettloff asked if the money first went through the State, 
which MrAnzek confirmed.  MrDettloff clarified that the 
money secured for Tienken Road was not in jeopardy of 
going away.  MrAnzek agreed, and he added that the City 
was also a recipient of $305,000.00 for 2009 for specialized 
radar control signs for high traffic areas.  
 
MrSchroeder asked if they knew the status of the Crooks 
Road/M-59 interchange and what type it would be.  Mr
Anzek advised that MDOT had directed the Road 
Commission to complete the design development for the 
interchange.  They looked at a dual span, four-lane concept 
in 2003, but there were a lot of things on the table.  They 
had discussed the exit ramps becoming roundabouts.  If 
they did a single, five-lane span, they would have to close 
Crooks, which could impact the businesses on either side
 
MrRousse stated that the bridge had to be replaced, and 
they hoped it would be done in conjunction with the M-59 
widening.  They did not know if it would be a two or four 
lane or double span.  MrSchroeder commented that 
something had to be done with Crooks in that area, and Mr
Rousse offered that they had plans for some work from Star 
Batt to Hamlin this year.
 
MrHooper said that at a recent meeting with the Road 
Commission, he learned that they were not aware of what 
MDOTs desires were, but MrDavis (City Engineershared 
it with them.  MrHooper felt there was a willingness to do 
something, but the Road Commission was out of money.  
They want the City to fund right-of-way acquisitions and 
make improvements, so there will be a significant 
budgetary impact if they proceed.  
 
MrHooper referred to the Karas Creek Bank Stabilization, 
and said it was discussed quite a bit last year, and they 
questioned whether it should be funded out of pathways or 
drains.  The budget had a $370,000.00 project in it this 
year, and he was certain the Karas repair had been covered 
and funded in the project.  He asked if something had 
changed.  
 
MrRousse advised that it was a new project.  They did a 
survey of Hamlin Road, and it was identified that the banks 
could be washed in when they rerouted the creek.  He 
asked MrHooper if he was referring to the Clinton River 
Bank Stabilization project.  MrHooper said that SW-03
had been funded for $370,000.00 for this year.  He recalled 
that how it would be funded was discussed during the 
August budget talks.  He wondered if it was the same thing 
and whether it was already in the current budget.  MrAnzek 
said he would get with Roger Moore and check the status 
and look at last years funding.
 
MrHooper brought up SW-08B, Clinton River:  Natural 
Channel Restoration, and he said it showed restoration 
scheduled to begin in 2009.  It was not in the budget, so he 
wondered if it was an error.  MrRousse said that the grant 
application did not go through, so it would not happen.  One 
project in conjunction with it was the stabilization of the 
bank near the bridge by the Trail.  That was one of the 
things they had hoped to accomplish with the above 
project, but they were not successful with the grant 
application.  They were going to resubmit and, hopefully, be 
successful.  He agreed that the year should be updated 
appropriately.  
 
MrHooper referred to PW-08E, Tienken Road Pathway:  
Historic District (Van Hoosen Road Washington Road).  
He said that Chairperson Boswell might concur, and he 
recalled that when they approved Mill Stream Village, the 
Site Plan showed a pathway.  He remembered MrKaiser 
saying that they were not going to put the pathway in at that 
time, because there was no way to get across the bridge.  
MrHooper thought they might have collected money from 
Grand Sakwa to fund the pathway.  MrAnzek also thought 
there was money put into an escrow.  MrHooper asked 
him to verify that to see if there would be some added 
funding.  MrAnzek recalled that they built the pathway up 
to Letica Road, but east of Letica, to the Historic Village, the 
pathway was not built.  They were forced to use the south 
side of Tienken because the first house on the east side of 
Stoney Creek was so close to the road.  MrHooper thought 
it was more of the fact that there was no way to get across 
the bridge, and MrKaiser specifically said they would not 
put in the pathway.  It was his opinion that the City could not 
try to force a developer sometime in the future who could 
be long gone to make it happen, so they required monies 
for the fund.  He was not sure how the process exactly went.  
MrAnzek said he would check to see if funds were put into 
an escrow account.
 
MrHooper brought up the street lighting projects.  They 
discussed having a policy regarding street lighting, but City 
Council did not have one yetHe thought that before they 
started doing all those projects, that a policy should be 
referenced in the CIP.  
 
MrRousse advised that the projects came up when the 
plan for the road was in place.  At that time, they had 
identified a number of different types of lighting, including a 
casting plan for the residential and business areas.   Mr
Davis had put together some cost estimates for it.  He 
agreed that the City did not currently have a street lighting 
policy for local or major roads.  MrHooper asked 
Chairperson Boswell to put the policy discussion on a 
future Planning Commission agenda so they could study 
and provide a recommendation to City Council regarding 
City-wide street lighting for major and local roads.  
 
MrHooper referred to MR-13A, Dequindre Road 
Realignment, and said that in the meeting with the Road 
Commission (which had taken place the day before)
mention was made that the number two priority for City 
funding was improving Dequindre from Hamlin to Auburn 
Road.  MrRousse said that each time local transportation 
bills were appropriated, the local representative got to add 
high-priority” projects to the bill.  Congressman Peters sent 
out a request for projects, and Staff gave Mayor Barnett a 
couple of options.  One was to extend Dequindre from 
Auburn to Hamlin.  The Road Commission had already 
submitted from Square Lake to Auburn, and the City asked 
to extend that.   Mayor Barnett had not fully submitted his 
request yet, and he was considering other options.  Mr
Hooper thought it should be a CIP project if it was a number 
two priority.  MrRousse said that it was in the 
Transportation Approval Plan, and the Road Commission 
submitted the projects in segments.  He did not think the 
Mayor sent anything out about his priority.  He was 
considering Avon from Livernois to Rochester and Hamlin 
from Rochester to John R, and MrRousse did not think he 
had made a decision.
 
MrAnzek agreed it should be a CIP project.  MR-13
referred to improving Dequindre from Avon southward, 
which was identified in the recent Master Thoroughfare 
Plan as one that would get the best bang for the buck in 
terms of alleviating traffic.  If traffic was diverted down 
Dequindre to M-59, it would take traffic off of TienkenThe 
City had started discussions with Shelby Township, 
Rochester and the people who owned Yates Cider Mill 
about trying to work it out.  MrHooper asked if they should 
create MR-13C, which was agreed upon.  
 
MrHooper referenced SS-30, Sanitary Sewer Easement 
Machine, and asked if it was a miniature version of a vactor 
truck.  MrRousse said they submitted it because of 
something they discovered near the Clinton River.  In order 
to get to a problem in River Bend Park, they had to build a 
road.  They were able to access it from the south, but north 
of it the sewer went through the residents’ backyards.  They 
would have to have cleared a very large area for the vactor 
truck.  The Easement Machine was a small track machine 
with a power flusher on it, and it would expend the hose 
without removing any landscaping.  It would give better 
access to remote areas without heavy equipment.  
 
MrHooper next mentioned PS-09A, Olde Town District:  
Redevelopment Study.  He said that when he got on the 
Planning Commission 12 years ago, they had an Olde 
Town study done, and he asked what was wrong with that 
one.  MrAnzek said that it could not unify people into a 
common theme or desire.  They were proposing to do most 
of the new Study in house, but they would need some help 
with graphics.  They hoped to begin this year with public 
meetings to try to find a vision.   There were many 
compound issues with the Auburn corridor, and the plan 
that was done in 1998 fell a little short.  It was an illustrative 
concept of what could be done with street furniture 
hardware, benches, plantings, etc.  It did not look at how to 
deal with MDOT to get rid of continuous curb cuts and look 
for parking behind the structures in a way that would not 
adversely impact the residential areas.  They did not think 
the project could be done successfully just working with the 
business owners.   Council would decide whether or not to 
fund the project.  
 
MrHooper referred to the LDFA Master Infrastructure Plan, 
and said he supported it, but he wondered why the City
Asset Management System (AMScould not be used for it.  
MrAnzek thought it would be a contributor, but the AMS 
could not look at the roadway systems and determine if one 
could be extended somewhere and determine if that would 
spur development.  AMS would give them the age and 
inventory of pipes that could be built into a replacement 
schedule for LDFA monies.  
 
MrHooper asked about the Landfill Planning Area Study.  
MrAnzek said that the M-59 Corridor Study was identified 
in the previous year to be funded by the LDFA, and the 
Landfill Planning Area Study was being proposed to put the 
Corridor Study and the LDFA Infrastructure Plan together.  
MrHooper asked if anyone had been hired for the LDFA 
Plan, noting that it was in this years budget for $50,000.00
and MrAnzek informed him that the City had not sent it out 
for bids yet.  
 
MrAnzek noted that MrDelacourt was taking the lead on 
the Landfill Planning Area Study.  He had put together a 
work program, and they would like to do it mostly in house 
with some support from ASTI for the environmental 
analysis.  The $60,000.00 cost was over a two-year period.  
 
MrHooper commented that he really liked the information 
in the CIP about the Local Road Program.  When they first 
started it, there was one sentence.  Now there were maps, 
pqi ratings and road conditions, and the City was really 
transparent about doing things.  He asked if there was a 
way they could show an overall rating of the City how 
much they (prudentlyspent and how much the road ratings 
improved.  
 
MrRousse responded that they could do that, but he did 
not think MrHooper would be satisfied.  All the concrete 
work they did last year was less than one mile, and the City 
had 225 miles of paved roads.  They improved ratings 
using asphalt, but for concrete, they did not really improve 
the total road segment because they did not do enough of 
it.  MrHooper commented that facts were facts and they 
told a story, and people should know that $million only 
does x amount, for example.  MrAnzek thought it was a 
good idea to show what the average pqi was and what the 
City had been spending on roads.  MrRousse agreed that 
it could be added.  
 
MrHooper said he was very pleased they had a CIP, and 
he agreed that it had been a great tool.  MrAnzek thought it 
got better and better every year.  
 
MrKaltsounis wondered if there was a way to show when 
they recouped money from energy conservation.  MrAnzek 
said that in 2008, the Mayor called for 25reduction in 
energy costs in two years.  MrRousse started readjusting 
thermostats and systems throughout City Hall, and lights 
were set to go off by a timer things like that and they 
saved 18in energy costs.  That was equal to one month
savings on all buildings.   The group talked further about 
LED lights and return on investment.
 
MrReece congratulated the Team on the Plan.  He stated 
that if there was one good thing with the current economy, it 
was that professional services fees were way down.  He 
suggested that they might want to take advantage of it while 
people were trying to keep their staff busy.  Relative to the 
construction costs, the professional estimators in his office 
could not keep up with the rate the projects were dropping.  
They were seeing unprecedented lows in projects.  He 
realized that the City was in a crunch also, but anything 
they could do now to take advantage of a recession, they 
should strongly think about doing, because they would get 
significantly more bang for the buck in the next year or two.  
He remarked that it was amazing how much project costs 
had dropped from three or four years ago.  
 
MrReece revisited the Sanitary Sewer Easement Machine 
project and asked how often it would be used.  MrRousse 
said it would get an increasing amount of use because the 
City was transitioning from a construction mode to a 
maintenance mode.  There were a lot of sewers that had 
been constructed in remote areas that had not received 
attention.  They did the best they could with the current 
equipment, but there were some areas of the City that had 
not been touched in 15-20 years.  MrReece clarified that 
part of it was for preventative maintenance for the future.  
 
MrReece referred to MR-27, Major Road Bridge Rehab 
Program.  He said that the King's Cove Drive over the Paint 
Creek was not more than five or seven years old.   Mr
Anzek said it was in good shape, but the project was for an 
ongoing inspection program.  MrReece asked if it was just 
an inspection or if they were already experiencing problems 
with the bridge.  MrRousse said that there had been some 
problems.  It was mandatory that they inspected the bridge 
every two years as a preventative maintenance issue.  
They look for scouring underneath the water level, and they 
had to get in the water to see that.  They had not budgeted 
for it in the past.  It was put in the CIP because they knew 
the costs would come up.  There had been problems with 
expansion and contraction of the bridge and some early 
corrosion.
 
MsBrnabic referred to the Olde Town District Study and 
asked if it was a budget request.  MrAnzek said it was just 
being submitted as a CIP project.  It would be submitted as 
part of his departments budget, and the Mayor would 
decide whether he wanted it as part of his budget.  In the 
meantime, Staff was trying to determine what they could do 
in house, and he was preparing a work program for the 
Study.  The dollar amount might get significantly reduced if 
they did much of the work.
 
MsBrnabic hoped it was a plan to move forward, whether it 
was done in house or in combination.  She also questioned 
the study done 11 years ago, noting that there were 
problems with the concept.  Many months ago she talked 
with Dan Casey, the Citys Manager of Economic 
Development, and she was aware of the growth potential 
and that current conditions played a financial factor.  She 
realized there were many factors involved, but she felt that 
they needed to open the closet door and not just talk about 
it.  It had been dormant for a long time, and she felt that they 
needed to get it to a workable, viable plan.  It needed to 
become active and living, and they were not close to 
implementation.  A plan had always been sitting there, and 
everyone asked what to do with Olde Town, but that was as 
far as it ever went.  
 
MrAnzek said that it was a challenging part of the City, and 
he had to annually advise Council about it.  In 2001, they 
started to meet with some of the property owners and 
showed them plans, but they could not get any 
cohesiveness.  They were going in different directions.  Mr
Delacourt met with some of the property owners and asked 
them how well they knew their neighbors.  From Mr
Anzek's experience, if they did not have the owners 
organized with a common vision, the whole thing would be 
a waste of time.  There had been three different plans and 
all failed for the same reason the people were not 
organized.  He wanted to get them together and to 
understand their wants and needs.   It was going to be his 
personal challenge this year.  
 
MsBrnabic agreed that they needed to move forward with 
organization.  She saw that as the problem back in 1990.  If 
they came up with a plan that did not get implemented, it 
would be time and money wasted.  MrAnzek said that 
when he came to the City in 2000, there was $75,000.00 in 
the budget to do a more specific study from the 1998 plan 
and to take it to the next level.  There was $475,000.00 in 
the CIP.  When they started working with the residents, they 
could never get them on the same page.  He had 
recommended to Mayor Somerville that they not go forward 
until the folks were organized.  
 
Chairperson Boswell had received one card and he called 
the speaker forward.
 
Melinda Hill, 1481 Mill Race, Rochester Hills, MI  48306  
Regarding the discussion about the Millstream pathway on 
Tienken, MsHill clarified that it went eastward from 
Tienken to their detention pond, but it ended right in front of 
a pole and dropped off into the pond.  She recalled that 
there might be some money in the escrow.  She mentioned 
pending projects, WS-14B and SS-14B, water and sanitary 
sewer extension for Mead, Mill Race and Carter, and 
pointed out that she came last year to speak about them as 
well.  She was concerned because they had been in the 
CIP since its origination 12 years ago, but they were 
removed and put into Pending Projects.”   That happened 
primarily because of a lack of funds.  There was a project 
for water and sewer extension down Washington Rdfrom 
the Runyon/Washington roundabout to Dequindre, but they 
lopped off Carter and Mill Race due to money.  The goal 
that had been stated each year for the sewer and water plan 
was to extend the system to the remainder of the City.  The 
City started installing sewer and water 50 years ago, when 
it was Avon Township, and they were not completed yet.  
She felt that those projects should be put back in the body 
of the CIP rather than in Pending Projects.  It appeared that 
there was less focus on Pending Projects from a planning 
and budgeting standpoint.  She understood that dollars and 
cents were tough.  They were having trouble keeping up 
with the budgets they had, and they were trying to do 
replacements already when they had not even completed 
the system for the whole City.  She did not think they had 
conversations about alternative ways to handle the projects; 
that was why she would rather see them in the main body of 
the CIP.  Even if they did not have the funding, she stated 
that it should still be in the CIP, in the way that Crooks Road 
lighting was in it even though there was no policy.  
 
MsHill suggested that the above project should be 
appropriately described.  It described the extension for 
Mead Rdbetween Sheldon and Washington, but it was 
really Mead from Sheldon to Winkler Mill and Winkler Mill 
from Mead to Washington.  It talked about Dequindre at 
Mead, and they did not even meet.  She was not sure what 
portion was missing, but she would like to see it corrected, 
and she would like to see it in the main body of the CIP.  
She thought it would be a good idea to have a map of the 
water and sewer system, showing where in the City it had 
been completed in one color, and showing the areas that 
were not completed in another.  That would give the viewer 
an idea of was out there, even if the projects were still listed 
as Pending.
 
MsHill referred to MR-40B, Tienken RdBridge over 
Stoney Creek.  She believed that some people had never 
heard about this because there had been no public 
discussion about it at a City Council or Planning 
Commission meeting.  It was the first time it had shown up 
in the CIP.  There have been other Tienken Rdcorridor 
projects, but this one was new.  She said that unfortunately, 
it was her understanding that it was for a very base model 
bridge that met all the safety criteria for the size of the 
bridge.  The concern was the actual size and scale, and 
that the look and feel would not be compatible with a 
nationally registered historic district.  She felt they needed a 
better product.  She would not want to see the same thing 
that was dropped in over the Paint Creek River.  She 
noticed a lot of other communities doing nice, creative 
things along the sides of their bridges that enhanced the 
look.  She did not think they did a good job at Paint Creek.  
She realized it cost money, and when she saw they would 
be paying 5% (43,750.00she had a concern.  The 
estimated cost of the project was $2.million.  10of that 
would be $230,000.00, so she wondered how 5was only 
$43,750.00.  She knew the costs would be higher if they 
tried to do anything more compatible with the area.  She 
would not like to see the Planning Commission approve a 
document with those estimated dollar figures.  When the 
CIP goes to Council they think they have to budget a certain 
amount to build it next year, but there had not been any 
discussion.  She hoped they were concerned also.
 
MsHill talked about one last item, which was about 
improving Tienken Rdfrom Livernois to Sheldon.  In the 
description it showed that they City had an earmark of  
$10.million.  She pointed out that about $750,000.00 of 
that money was used for the Paint Creek bridge.  She 
believed all that was left was about $6.million because 
other agencies got some of those funds.  The roadwork was 
to cost $14 million.  If there was only $6.8, she was not sure 
where the rest of the money would come from.  
 
MrHill mentioned that the CIP used to show the estimated 
project costs in the descriptions of the projects, not just on 
the spreadsheet.  It did show the estimated City share, but it 
now people had to flip back to the spreadsheet to find the 
real project totalShe thought it would be helpful to see both 
in the description area.  She agreed that the CIP was very 
helpful, but she stated that it had grown over the years, and 
one thing indicated was that dollars were harder and harder 
to come by.  The Planning Commission and the City 
Council had to determine how they were going to deal with 
that fact.  She reiterated that she was concerned about not 
ever having sewer and water coming to the northeast corner 
of the City.
 
Chairperson Boswell asked if there were further comments.  
He indicated that there were some dollar questions raised 
by MsHill to address.  MrAnzek replied that they had 
taken notes, and that they would provide a comprehensive 
memo in response prior to the Public Hearing in May.  If 
there were any other questions or comments, he asked that 
they be forwarded as soon as possible.  
 
Chairperson Boswell asked MrHooper if he wanted 
MR-13C added this year (Dequindre Rdimprovements 
from Auburn to Hamlin).  MrHooper said it would not be 
done this year, but it should be listed as a project in the CIP, 
as should others on the wish list.  
 
MrAnzek noted that the energy-based projects were not 
listed in the CIP, and they were going after stimulus money 
for those.  MrHooper said they should be in the CIP, 
because if someone wanted funding for a project but it was 
not in the CIP, it would be difficult.  MrAnzek said they 
should make a provision to identify energy or various 
projects, and as others came along, he suggested that the 
Plan would have to come back to the Planning 
Commission for amendments.
 
MsBrnabic indicated that she liked the organizational 
change, noting that it was much easier to go through the 
document to find things.  She thanked everyone who had 
worked on it and agreed that they did a great job.  
This matter was Discussed
ANY OTHER BUSINESS
Election of Officers:
 
MrKaltsounis felt that the current slate of Officers should 
be kept on the Planning Commission and the following 
motion was made:  Upon motion by Kaltsounis, seconded 
by Yukon, Chairperson Boswell was unanimously 
re-elected as Chairperson; Deborah Brnabic was 
unanimously re-elected as Vice Chairperson; and Maureen 
Gentry of the Planning and Development Department was 
unanimously re-elected as Secretary, all for a one-year 
term to expire the first meeting in April 2010.  
 
Meeting Start Time:
 
MrAnzek advised that this matter would be brought up with 
all the Boards and Commissions that worked with Planning 
and Development.  He further advised that City Council 
recently voted to start their meetings at 7:00 p.m.   
According to the By-laws, the Planning Commission can 
set a time for their meetings each year, and Staff wanted to 
see if there was interest in moving the time to 7:00 p.m
from 7:30 p.m.  City Council considered the ability of 
applicants and residents to get to the meeting by that time.
 
Chairperson Boswell said that he personally had no 
problem with 7:00 p.m., and MrSchroeder said he was all 
for it.  MsBrnabic thought that any earlier might pose a 
problem with traffic.  MrHooper added that he was all for 
7:00, but 6:30 would be difficult.   MrAnzek said he would 
look at the By-laws to see if they had to be amended, and a 
formal motion would be made at the next meeting.
 
FURTHER BUSINESS:
 
MrAnzek advised that City Council had adopted the new 
Zoning Ordinance the previous evening, and he thought 
they were generally pleased with it.  
 
MrAnzek brought up Extensions, and the fact that there 
was a fourth one requested, and said it was becoming 
difficult.  He suggested that they have a policy discussion 
about it.  He did not have a problem with Extensions, as 
long as the development met the law.  Grace Parc was a 
little trickier because it did not meet the Engineering 
standards.  The question of ownership and foreclosure also 
came up.  He wondered how the Planning Commission felt 
about continually granting Extensions.  He thought they 
could be doing it for a few more years for developments 
approved over the last three or four years, and he 
suggested that they think about it and add it to the next 
meeting.  
 
MrKaltsounis asked how short the line of applicants was.  
MrAnzek responded that Staff had some very positive 
meetings, but the number one problem was credit from the 
banks.  There had been a lot of developers interested in 
doing things in the City.  As bad as the economy was, 
Rochester Hills had one of the lowest unemployment rates 
in Oakland County.  There was still competition in the 
marketplace, and he mentioned several places that were 
doing well, such as The Boulevard Shoppes.  He stated that 
the car industry was causing businesses to merge and 
divide, which was creating new demands for space.  It was 
not great, of course, and the City did not have much land 
left.  Projects were turning to redevelopment
 
MrKaltsounis asked about the gas station on Rochester at 
M-59 closing.  MrAnzek was not aware of it, but he said 
that the owners had brought in several concepts over the 
last couple of years that did not work because of the 
abutting residential.  
 
MrDettloff said that he did not have a problem working with 
developers on Extensions, but had the foreclosure not been 
discovered, they would have looked foolish granting one.  
He thanked MrAnzek for the information, but said he 
thought it should have come from MrMancini.   If 
developers were up front, he maintained that the 
Commissioners would work with them, but MrMancini 
made the situation uncomfortable.  MrAnzek said that he 
should not have to judge the scruples of applicants, but 
because of one situation, Staff would now have to start 
checking ownership of properties when they went for 
Extensions.  He believed that MrMancini was obligated to 
report the foreclosure.  MrReece said that the applicant 
lost some credibility when he said he did not want to drive a 
little ways to get a formal letter from the bank.
 
MrReece asked how many plans or plats were out there.  
MrAnzek said there were about eight.  Some had dropped, 
like Saddlebrook Orchards.  MrAnzek said he would put 
some guidelines together regarding Extensions for the next 
meeting.  
 
MrKlomp said he watched a Council meeting about a 
month ago, where they announced that M-59 would be 
improved with stimulus money and he was pleased at how 
well the City handled it.  MrAnzek agreed, and noted that if 
MDOT had funded the project, the City would have been on 
the hook for $million.  The City was now in a position to 
take the $million and perhaps use it as leverage for the 
Crooks Rdinterchange or another project.   
 
MrSchroeder reminded that the Commission held one 
session about LEED building, but they had two to go.  Mr
Anzek said he would look into it.  MrAnzek mentioned that 
the new Meijers would be a LEED qualified building.  
Meijers embraced LEED principals a few years ago, and it 
had a tremendous return on investment.  They now build all 
LEED qualified buildings, although they did not necessarily 
pay the fee to become certified.  MrReece said that all 
projects should try to at least become certified, because it 
was not costly.  
 
MrSchroeder noted that Rochester Hills was mentioned on 
a television program as the best city to live in the State.  Mr
Anzek added that Relocate America voted Rochester Hills 
as one of the top 100 cities to live.  It helped the City with 
marketing and attracting jobs.
 
The members ended with a conversation about the new 
trash hauling and recycling system in the City, with which 
they seemed satisfied.  
NEXT MEETING DATE
The Chair reminded the Commissioners that the next Regular Meeting was 
scheduled for May 192009.
ADJOURNMENT
Hearing no further business to come before the Commission, and upon 
motion by Kaltsounis, the Chair adjourned the Regular Meeting at 9:45 
p.m., Michigan time.
 
 
 
 
 
 
_____________________________
William FBoswell, Chairperson
Rochester Hills Planning Commission
 
 
 
 
_____________________________
Maureen Gentry, Recording Secretary