Minutes
Brownfield Redevelopment Authority
Chairperson Thomas Stevenson, Vice Chairperson Suzanne White
Members:  Stephen McGarry, George Karas, Stephanie Morita, 
Thomas Turnbull, Michael Webber
7:00 PM
1000 Rochester Hills Drive
Thursday, February 21, 2008
MINUTES of a ROCHESTER HILLS BROWNFIELD REVELOPMENT 
AUTHORITY REGULAR MEETING, held at the Rochester Hills Municipal 
Offices, 1000 Rochester Hills Drive, Rochester Hills, Oakland County, Michigan.  
CALL TO ORDER
1.
The meeting was called to order by Chairperson Stevenson at 7:00 PM.  
ROLL CALL
2.
 
George Karas, Thomas Stevenson, Stephen McGarry, Thomas Turnbull, 
Michael Webber and Stephanie Morita
Present
6 - 
Suzanne White
Absent
1 - 
Also Present:     Ed Anzek, Director, Planning & Development Department
 Derek Delacourt, Deputy Director, Planning & Development 
 Department
          John Staran, City Attorney
          Jim Anderson, STS Consultants
          Judy ABialk, Recording Secretary
DETERMINATION OF A QUORUM
3.
Chairperson Stevenson stated a quorum was present.  
APPROVAL OF MINUTES
4.
 
4A.
2008-0080
Regular Meeting of January 172008
Chairperson Stevenson asked for any comments or changes regarding the January 17
2008 Regular Meeting Minutes.  Upon hearing none, he called for a motion.  
A motion was made by Webber, seconded by McGarry, that this matter be 
Approved as Presented.   The motion CARRIED by the following vote:
Aye
Karas, Stevenson, McGarry, Turnbull, Webber and Morita
6 - 
Absent
White
1 - 
RESOLVED that the Minutes of the January 172008 Regular Brownfield Redevelopment 
Authority Meeting be approved as presented.
ANNOUNCEMENTS/COMMUNICATIONS
5.
Chairperson Stevenson called for any announcements or communications.  
 
MsMorita reminded the Authority that a Brownfield Symposium was being held May 
5-72008 at the Cobo Center in Detroit and stated she hoped the members could 
attend.  
 
Chairperson Stevenson noted the Authority had received a copy of the 2008 Year 
End Report from the Planning & Development Department.  He called for any other 
announcements or communications.  No other announcements or communications 
were provided.  
PUBLIC COMMENT (Non-Agenda Items)
6.
Chairperson Stevenson called for any public comments regarding non-Agenda related 
items.  No public comments were received.  
UNFINISHED BUSINESS
7.
 
7A.
2007-0435
Update Regarding Hamlin/Adams Development
Chairperson Stevenson reminded those in audience that speaker cards were provided 
at the back of the auditorium, and if anyone wished to speak on this item, they should 
complete a card and turn it in to the recording secretary.  
 
Chairperson Stevenson invited the developer to take a seat at the presenter table and 
asked them to introduce themselves by providing their name and address.  
 
Neil Silver, Attorney for the developer was present, and introduced Paul Henderson, 
Developer, and Tony Anthony, AKT Peerless, Environmental Consultant.  MrSilver 
stated that MrAnthony would provide an update on the investigation on the site and 
proposed remedy.  
 
MrAnthony stated that the last time they were before the Authority, the Authority 
had approved an investigation to refine the remedy for the site, and noted that 
investigation included several borings and monitoring wells.  He explained they set out 
to look at the areas of concern and to define the extent of those areas, i.e., how much 
material would have to be removed from the areas they had identified.  
 
MrAnthony stated one of the strategies used while they were on the site was test 
pits.  He explained in some areas where test pits identified fill material and buried 
drums, they excavated additional test pits around those areas in order to define how 
much material had to be removed.  He referred to a map of the site, and explained 
there were light blue circles that identified areas of concern, and areas that through test 
pits, soil borings and monitoring wells, they were able to refine the extent of removal.  
 
MrAnthony pointed out the section of the site identified as Area A where they did 
test pits and moved regularly outward from the original location where they had 
previously found contaminants, so they could define the area.  
 
MrAnthony pointed out Area B, which contained a grid of several sample locations 
that were between the fenced-in area where the drums with paint waste were buried 
and the adjacent residential neighborhood.  He explained earlier investigations had 
found PCBs in the surface soil.  Because, at that time there were only a few points 
where PCBs were detected, they were concerned that the PCBs had migrated from 
the area within in the fenced area where the highest concentrations were, and were 
moving towards the residential neighborhood.  Part of their investigation was to look 
at that in a fine grid and to determine whether that was happening, or whether there 
was some protection of the residents.  Through the grid they were able to show that 
the PCB concentration at the surface was safe and below any residential contact.  
There were PCB detections, but at a concentration that was below the residential 
criteria.  He stated they did not see any consistent concentration gradient.  He 
explained the normal expectation was to see the highest concentration at the source, 
and then progressively lower concentrations as they moved away from the source.  He 
stated they did not see that, which further told them they did not have what they had 
feared, i.e., the migration of PCBs from the landfill area (the fenced areato the 
residential neighborhood, which was good news.  
 
MrAnthony pointed out another area they had looked at, described as Area C.  As 
they excavated their test pits in that area, they found a great deal of debris intermingled 
with contaminated soil.  He stated they saw things like metal debris and broken glass, 
noting that type of material is very common for old landfills.  He explained that in old 
landfills, the organic material will begin to intermix with the soil, but things like glass 
and metal that do not break down and intermix with the soil, remain.  When those 
areas are dug out, what is seen are things such as old bottles and remnants of metals.  
He stated in that area, as well as highly contaminated soil, was the inter-mixed debris.  
 
MrAnthony pointed out Area D, and stated that during an earlier investigation 
involving test pits, they encountered a drum.  At that point they were concerned that if 
they found a drum outside of the fenced-in area, that perhaps the drum burial area was 
much larger.  One reason they did numerous test pits and borings was to confirm 
whether there were additional areas where drums were buried, or if that was just an 
anomalous area outside the fenced area.  He stated that the test pits circled the area 
and they did not find any additional drums, which allowed them to define the extent 
and limit the area.  
 
MrAnthony stated the additional testing told them they did not have any widespread 
drums buried out there.  He indicated that in working closely with the City and City
consultant, the question came up about what if there was another anomalous area 
found during construction, which sometimes happened on brownfield sites.  He stated 
the 381 Work Plan included a section called unforeseen conditions” which was to 
account for if they found another anomalous area.  He noted what they felt 
comfortable about was that there had been a considerable amount of test pits on the 
site and borings that told them where the majority of the landfill was located.  
 
MrAnthony pointed out Area E, which also had highest PCB contamination.  He 
stated that because the PCB contamination was high, that was the area that would be 
encapsulated.  He explained the area outside was removal.  
 
MrAnthony referred to the overall map, which identified the areas of removal action 
and stated it could be seen that the vast majority of the area that was covered with fill 
material would be removed.  He again pointed out the limited area that would be 
encapsulated.  He explained the encapsulation would consist of a two-foot wide clay 
wall, which would extend two feet into natural material, extending upward to the 
surface, and then the fill material would be encapsulated with a clay cap and an FML 
material.  He stated the FML material was similar to a very thick garbage bag that was 
welded together and then keyed in all sides of the landfill itself.  
 
MrAnthony stated that during the construction phase; the removal action; 
constructing the walls, and constructing the cover, Community safety was of utmost 
concern.  They will incorporate a rigorous air-monitoring plan, which would involve 
initially at the worksite, screening for volatiles.  Immediately at the zone where they 
were doing excavation, they would be monitoring for volatiles.  That way, they would 
contain it immediately.  At the perimeter of the property they would have dust 
emission monitoring.  He explained that was real-time monitoring, and the monitors 
were also equipped with a visual alarm.  If the allowable air/dust emissions were 
exceeded for a one minute period, the alarm would go off.  When the alarm went off, 
all operations at the site stop.  He stated the alarm would continue to monitor, and no 
work would resume until a ten-minute continuous time where dust was suppressed 
occurred.  He stated even before the work was resumed, they would look at whether 
additional dust suppression was required.  The additional dust suppression might mean 
misting in order to help keep the dust down.  
 
MrAnthony stated they had worked closely with the City in providing more detail on 
the construction of the wall, for instance going through geo-technical testing on the clay 
ensuring its integrity; shoring or trench boxes to ensure the safety of the workers on 
site, and also the integrity of the wall.  Testing and welding of the plastic cap are also 
an integral part of the cover.  
 
(Arrive Member White:  7:17 PM)
 
Suzanne White, George Karas, Thomas Stevenson, Stephen McGarry, 
Thomas Turnbull, Michael Webber and Stephanie Morita
Present
7 - 
2007-0435
 
MrAnthony stated the other part of the investigation they looked at was their concern 
about methane.  He explained they were concerned about methane coming from 
across the street.  They also conducted their own methane investigation on the 
property, and found that no methane had been coming across Hamlin Road.  He 
stated in speaking with the Michigan Department of Environmental Quality (DEQ), the 
DEQ had looked at the landfill site across the road and the methane produced there, 
and the DEQ believed the methane was being intercepted by the utility trenches on the 
other side of Hamlin Road
 
MrAnthony stated they did have methane detections within the fenced area.  He 
explained they had two detections, and noted that area not only contained the high 
concentrations of PCBs, but also volatile organics.  He commented that volatile 
organics were a common chemical found with paint wastes.  He stated that volatile 
organics could contribute to methane production as they decay.  Because of that, the 
two buildings proposed for within 500 feet of that area would have a presumptive 
remedy.  He explained that remedy included a vapor barrier beneath the building, 
which would be put there just in case” or as another layer of protection to redirect 
any potential vapors, both VOC vapors or methane, that might come from the 
encapsulated area.  It was just another protective layer.  Any other building on the site 
would be greater than 500 feet away from the encapsulated area, which currently fit 
DEQ guidance for these types of sites.  
 
MrAnthony explained another issue they looked at was truck traffic.  They wanted to 
minimize truck traffic that could possibly disturb the residents.  He pointed out the 
interchange with M-59 on the map, which would bring the trucks up to Hamlin Road, 
and stated the trucks would access the site off Hamlin Road.  He stated if there was 
more than one truck, which was likely while hauling material, all trucks would be 
staged on site and not in the roads disrupting traffic.  After loading, they would set up 
a turn-around path to exit onto Hamlin Road and proceed back to M-59.  
 
MrAnthony stated that one other part that was important in this remedy, which 
consisted of a removal action and encapsulation of the high PCBs, was to control 
storm water.  He stated in a traditional setup that was not dealing with contaminants, 
where it was not a brownfield site, the storm water would be above ground retention 
ponds.  On this site, they wanted to prevent infiltration into the groundwater.  He 
explained by preventing infiltration, it further strengthened the stability of the 
encapsulation system.  He stated they proposed to install a belowground storm water 
system in one of the areas of the removal action that did not allow infiltration.  That 
capacity would come out and leave the site.  He pointed out one small area of above 
ground, which would be designed as a sediment trap for what is called first flush.  He 
explained with the smaller pond there would be an FML liner that would restrict and 
prevent infiltration.  
 
MrAnthony summarized the remedy as removal action for the majority of the area of 
contamination; encapsulation of the high PCB concentrations, and then control of 
infiltration
 
MrSilver added that they wanted to thank MrDelacourt and MrAnderson for their 
input in helping them design the remedies.  He thought the remedies would meet safety 
requirements and the terms of the Consent Judgment, and were protective of both the 
residents and the site.  He stated they were available for any questions
 
Chairperson Stevenson stated he would take public comment at this time.  
 
Ed Baron, 3310 Greenspring, stated he was a former City Council member and 
Planning Commissioner.  He referred to the barrier between the gases and the air as a 
piece of cloth.  He commented the developer had something to sell and wanted to see 
if the City would buy it.  He stated they had learned that although their intentions were 
honorable, they were not experts in environmental issues and did not have the 
credentials.  He was glad the developer used help to define it.  He stated he, Brenda 
Savage and Bill Windschief had called the EPA when that site was opened up and 
construction stopped.  He remembered the tragedy that happened in MsWhite
neighborhood due to methane gas.  He thought it was a matter of health and safety 
and should be addressed in a manner that protected the residents.  
 
Brenda Savage, Post Office Box 82487, Rochester, MI  48308, stated she was 
the Chairman of the Rochester Hills No New Taxes.  She asked for continued 
investigation as to the level of safety for the development.  She requested that any 
information regarding the last participation between City Staff and the EPA to know 
what standards they were assessing and what their answer was in regard to the 
development.  She asked if the EPA planned further investigation as the development 
progressed.  She stated the concerns were the same safety and health issues, and 
beyond that to tax issues.  
 
Bill Windschief, 2872 River Trail, stated he was relatively familiar with the site as 
he lived nearby, and had been investigating the site for a long time, ever since the 
development activities were proposed.  He was pleased they were finding out more 
about the site with each exploration that the developer did.  He thought that made 
everyone feel more comfortable they were proceeding in the right direction.  It was his 
intent to make sure they got the right type of development on the site, and working 
with the developer and contractor to ensure they had good safety practices for the 
residents and the nearby park and the river.  He recalled reading that very high levels 
of PCBs were reported in various documents, some of which were extremely high 
levels in Area E.  He recalled they were 6,000 ppm, and recalled the threshold for an 
acceptable level was 50 ppm, and expressed concern about that.  He stated later 
reports indicated lower levels, and thought some things could vary on the site.  He 
asked what the EPA said about the site based on the high levels of PCBs.  He 
believed it was a good idea for the EPA to review the work plan and the remediation 
plan and the public health and safety issues.  
 
MrWindschief referred to the eastern boundary, and asked if the PCB level 
stopped at the boundary, since no one knew how the landfill had been filled.  He 
thought it was important to know that to see what impact the development would have 
on the adjacent property to the east.  He referred to MrAndersons February 14th 
Memorandum to the City, which contained 18 or 19 questions about the 381 Work 
Plan, and asked if those questions had been answered and there was a level of 
confidence that the Work Plan, the public safety plan and the due care plan that would 
accompany the Work Plan satisfied all those questions.  He stated as a resident he 
wanted to know what the EPA said about the site.  
 
Lynn Loebs, 2845 Portage Trail, stated she was also an officer of the Clinton River 
Valley Homeowners Association, which was the property just to the north of the site.  
She wanted to address the air/dust monitoring equipment planned for use on the site.  
She stated there were a lot of technical levels for the air monitoring, but there was no 
definition on the dust levels.  She asked whether the dust level would be set so that it 
would put an inch thick of dust on her dining room table every day, or she would not 
see any dust.  She wanted to understand what level was acceptable, and would like to 
encourage the developer to develop a very consistent level of communication with the 
homeowners in the area, before, during and after, so they would know what was 
done, what was expected to be found, what was found, and any changes made in the 
plan on an on-going basis.  She referred to the storm water retention, which was 
indicated close to the backyards of the adjacent homes.  She commented they were a 
family neighborhood with young children who would have access to that area.  She 
would like to see it moved to a more visible, public area away from the homes, or if 
some remedy could be found to make it inaccessible that would be conducive with the 
visibility and the aesthetics of their neighborhood.  
 
Chairperson Stevenson called for any other public comments.  Upon hearing none, he 
stated that concluded the public comments, and asked if the developer wanted to 
respond to some of the questions asked by the residents.  
 
MrSilver stated he would like to respond to some of the procedural questions.  He 
indicated the approach to the cleanup plan was dictated by virtue of a Consent 
Judgment that was entered into on April 42006.  On September 282006, the initial 
Brownfield Plan was approved by the Brownfield Authority outlining where every hole 
ought to be and everything that ought to be looked at.  He noted they included certain 
extra protections that were not necessarily part of a 381 Work Plan for investigations, 
which was the initial baseline test for air monitoring.  He stated they submitted the first 
381 Work Plan on October 92007, and it has taken them working with the City for 
several months to todays date to be able to present the revised 381 Work Plan.  He 
believed they had a technically complete 381 Work Plan.  He clarified the 381 Work 
Plan was not just to meet technical DEQ requirements, but it needed to meet the 
Citys requirements as required through negotiation, such as encapsulation rather than 
placing a cap or parking lot over the PCB area.  
 
MrSilver stated the Consent Judgment also guided the Citys action with respect to 
the 381 Work Plan.  He explained the Consent Judgment stated if they had an 
administratively complete 318 Work Plan, the City was to approve it.  He understood 
there were other outstanding issues and questions with respect to what would actually 
happen.  He stated they tried to resolve truck routes, and they would comply with 
every Code and Ordinance, and noted they had an obligation to comply with 
everything.  He stated they would also comply with any reasonable request made of 
them at the time.  
 
MrSilver stated that although there were non-381 Work Plan issues that may still 
remain, he urged the Authority to approve the Work Plan so they could find out if the 
DEQ would be board with the Plan as well.  He reminded the Authority that the 
Consent Judgment said that if the DEQ does not approve the activities that are 
included in the 381 Work Plan, then they did not need to be done.  That is why they 
worked very closely together and had communicated with the DEQ and tried to come 
up with a 381 Work Plan with the maximum amount of protections they could have, 
that the DEQ would approve and allow for reimbursement.  
 
MrSilver said the issues that remained were not so much the work to be done, but 
how the work was to be done.  He thought the professionals that reviewed the Work 
Plan were all in agreement that the work to be done meets the spirit and intent of the 
Consent Judgment, and is safe for the residents of the Community.  
 
MrSilver referred to the EPA, and stated they knew the issue would come up.  He 
indicated there had been a joint telephone conversation between City Staff, himself 
and the developer.  He indicated they spoke to a MrsGreensley with the EPA, and 
she was provided with the data.  He stated MrsGreensley acknowledged 
unquestionably that the EPA did not have jurisdiction over pre-1978 landfills; 
however, she did state that if there was an eminent health issue associated with the 
site, they could step back in, but the burden would be on the EPA, not the developer, 
to show that the risk was there.  He indicated they had sent a letter of explanation and 
all the data to the EPA and were waiting for a response.  However, it was more of a 
procedural order in their mind, which he had discussed with the City Attorney.  Mr
Silver stated that without getting approval from the DEQ and from the Authority as to 
how they were going to approach the site, they could not really show the EPA how 
they would minimize risk on the site because they needed the agreement of the DEQ 
to sign off on the remedy they were proposing.  He stated it was a matter of what 
came first, the chicken or the egg” situation.  He requested that even if there were 
concerns with the EPA, the Authority approve the 381 Work Plan so it could go to 
the DEQ for their review, and then they could forward that on to the EPA, and the 
EPA can sign off on whether they wish to have jurisdiction.  He guessed the EPA 
would deny having jurisdiction.  He explained in 1986 they came out to the site and 
did their own investigation, and then gave the site back to the State of Michigan.  He 
noted the State of Michigan did the initial removal at the site back in 2001, all the 
subsequent investigations from 1986 until the present, until the developer took over.  
He commented the previous owner took over and did some, and all were done by the 
State.   
 
MrSilver stated it was their strong guess that the EPA would say it was being 
regulated by the State of Michigan and defer to the State of Michigan and say they do 
not have jurisdiction over the site.  He indicated as soon as they received that, they 
would provide it to the City.  He noted they would like to know that the remedy is fine 
as part of the EPAs review, and he thought they had agreed the remedy was.  
 
MrSilver stated it was their strong guess that the EPA would say it was being 
regulated by the State of Michigan and defer to the State of Michigan and say they do 
not have jurisdiction over the site.  He indicated as soon as they received that, they 
would provide it to the City.  He noted they would like to know that the remedy is fine 
as part of the EPAs review, and he thought they had agreed the remedy was.  
 
MrWebber referred to MrSilvers comment that they had sent a letter and materials 
to the EPA, and asked what date that was sent.  MrSilver stated it was sent over a 
month and a half ago.  MrWebber asked whether the letter was dated in January.  
MrSilver indicated it was an email with attachments sent in early December.  He 
explained there had been several telephone calls and emails exchanged, and finally a 
conversation was held with MrsGreensley on February 112008 via conference call.  
He stated it was clear from the conversation that MrsGreensley had not had an 
opportunity to really review the material in detail, and she had stated she would not 
have time to review and would have to give it to someone else to review as there were 
only two people in their department.  
 
MrWebber asked if the EPA had given them a time frame.  MrSilver responded 
she would not review it, but would give it to somebody.  He stated he had made 
contact with someone in the EPAs Brownfield Redevelopment side, who was copied 
on the data, and he would try to usher a quicker answer through that individual.  He 
stated that the remedy was part of that review, and until the Authority approved the 
remedy, they could tell the EPA that the site would be safe when they were done.  
 
MrWebber stated he was trying to establish a time frame, so the Authority would 
know when things were delivered to which bodies and when.  MrSilver hoped to get 
an email confirming their lack of jurisdiction soon.  
 
MrSilver reiterated the 381 Work Plan before the Authority was a technically 
complete document, and addressed the issues and concerns in the Consent Judgment.  
He stated the EPAs consent pursuant to the Consent Judgment was not really 
required until they asked for Building Permits or final Site Plan Approval.  He 
indicated the Consent Judgment contemplated that order as well.  He hoped that 
answered the more general questions about the timing.  He indicated the more 
technical questions could be addressed by either MrAnthony or by the City
consultant.  
 
MrDelacourt commented that the Brownfield Authority saw the original 381 Work 
Plan quite some time ago, and thanked the applicant for giving the presentation about 
what had taken place as part of their investigation and what they propose for 
remediation.  
 
MrDelacourt stated Staff and the Citys consultant, Jim Anderson, STS, had been 
involved in the review of Phase II proposed remediation.  He indicated they agreed 
that all the components required by Act 381 are in the document; however, Mr
Anderson still had some issues and questions to be addressed in relation to the 
document itself.  He explained that subsequent to the Authoritys packets being sent 
out last Friday, the applicant had provided even more revised information and 
continued to revise the plan as recently as yesterday.  He noted some of the issues 
were being addressed; however, until Staff had a chance to review the changes and 
MrAnderson had a chance to formally put it in writing, he was not recommending it 
was technically complete.  
 
MrDelacourt stated they wanted to know what the answers to the issues were 
before submitting the Plan to the DEQ, or before recommending that the Authority 
accept it and submit it to the DEQ.  Until those items were reviewed and addressed, 
he was not saying it was technically complete, rather they agreed all the components 
were there.  
 
MrDelacourt referred to the matter of the EPA involvement, and noted MrSilver 
was correct in his chicken/egg” analogy.  However, he did not agree which came 
first.  He explained that he had not, nor had the question been asked during any 
conference call he was party to, asked the EPA to approve the 381 Work Plan.  He 
believed the Consent Judgment did contemplate approval of the Work Plan prior to a 
Site Plan Approval, which is not where the project stood.  He stated he did want the 
EPA to provide a formal answer as far as jurisdiction, before a formal remedy is 
submitted to the DEQ.  He did not agree the EPA needed the proposed remediation 
plan to be accepted and submitted to the DEQ by the Brownfield Authority, in order 
to review the site as part of their risk analysis.  He was comfortable with the Work 
Plan being submitted to the EPA if they requested a copy.  
 
MrDelacourt stated that as part of the February 112008 conference call, the EPA 
had requested additional information, which was sent earlier today.  He thought the 
proposed remediation plan could be sent to the EPA for review if that was part of 
what they needed to make a decision regarding jurisdiction.  
 
MrDelacourt stated the only thing Staff was recommending was that than answer be 
provided prior to acceptance and submittal.  Staff did not feel it was appropriate to 
submit it formally to the DEQ until it was decided if they had jurisdiction or not.  
 
MrDelacourt stated another issue that had an impact on whether Staff felt the Plan 
was ready to be accepted and submitted was the storm water maintenance.  He 
explained storm water maintenance and the developers proposed remedy for their 
storm water, including the sediment dropout pond and the subsurface vaults, were 
being included as an eligible activity in the Plan.  Although Staff felt there was an 
argument to be made that a portion of those costs should be eligible, Staff had not 
seen a formal plan for how the storm water maintenance would work, and would like 
additional clarification on that matter.  He stated part of Staffs recommendation to 
withhold action at this time was because Staff felt these were reasonable questions, 
especially the EPA jurisdiction, to be answered prior to formal submittal to the DEQ.  
He noted draft copies of the Plan had been submitted to the DEQ, keeping the DEQ 
up to date on the information.  He stated Staff had offered independently to submit 
any information the EPA requested or needed to make their evaluation on jurisdiction, 
but disagreed with MrSilvers interpretation of the order.  
 
MrSilver reiterated his position, and explained he was hesitant to submit something to 
the EPA for their review and approval that had not been approved by the DEQ.  He 
questioned what would happen if the DEQ did not approve the plan and would not 
pay the costs.  He thought that wasted time and energy dealing with the EPA on 
something that would never happen.  That is why he believed it was not until the Site 
Plan Approval that the EPAs consent was required if they did have jurisdiction.  He 
stated they needed to know the City was on board and that the DEQ was willing to 
pay for that remedy before they could formally tell a Federal body that was the 
remedy that would be done.  He indicated the order had to be the approval of the 
DEQ because it did not have to be done pursuant to the Consent Judgment unless it
approved by the DEQ.  He noted the Citys approval was required before the Plan 
could be submitted to the DEQ.  He commented that he and the City Attorney had 
discussed this issue at length.  
 
MrStaran stated as far as the procedural question went, it was ultimately a question 
for the Brownfield Authority to determine based on what their comfort level was with 
the Plan in front of them and the questions they have.  He explained the Consent 
Judgment was very clear about some things, and less clear about others.  One thing it 
was clear on was that the principal inducement to the City to enter into the Consent 
Judgment was to solve a health problem by getting the site cleaned up and remediated 
to the extent reasonably and economically feasible, and to protect the residents.  He 
stated that was a paramount concern, and nothing in the Consent Judgment waivered 
from that.  
 
MrStaran stated there was a structure put in place through the Consent Judgment, 
but it was not intended to bypass or circumvent any State or Federal Statutory 
procedures, but was quite the opposite.  It was included because the City did not feel 
comfortable, nor did they feel it was lawful at the time the litigation and settlement 
discussions were going on, to use the Consent Judgment to bypass or attempt to alter 
through local negotiations what the normal processes were for the environmental 
remediation and the Brownfield Plan approvals.  
 
MrStaran clarified the procedures and time lines put in the Consent Judgment had to 
be construed and interpreted in the context of the statutory procedures.  He stated the 
EPA involvement and how it affected the Plan was important.  He noted EPA 
involvement and input was mentioned in several different places in the Consent 
Judgment.  He commented that documents did not always read as clearly as one 
would like them to read two years later, trying to answer a specific question.  He 
agreed it was an interpretation issue, and the Authority had heard MrSilvers view as 
to what the order should be, which was a reasonable interpretation.  He stated he 
could not tell the Authority that the Consent Judgment said it was different, but it was 
not that black and white.  He thought the EPA involvement was deemed very 
important and was more than just a technical requirement.  He stated if the EPA did 
assert jurisdiction and required certain things, the EPA could radically alter what 
needed to be done.  He noted in the alternative, if MrSilver was correct, the EPA 
could determine it was not their jurisdiction and would defer to the DEQ to be the final 
authority along with the City as to what should be done.  
 
MrStaran told the Authority the matter was susceptible to more than one reasonable 
interpretation, and he would not tell the Authority that the Consent Judgment requires 
the Authority to approve the submitted Plan at this meeting, although that was an 
option.  He noted another option the Authority had was to accept the Plan and 
approve it for submission to the DEQ subject to EPA approval, if the EPA determines 
that is required.  He also pointed out another option, as being recommended by Staff, 
would be to await that determination from the EPA before the Authority made their 
determination whether to accept the Plan.  
 
MrStaran noted that MrSilver was correct in his statement about submitting a Plan 
to the EPA that the EPA agreed to, but that the DEQ denied.  He supposed the 
reverse was also true, such as the Authority accepting the Plan, the DEQ approving 
the Plan, and the EPA deciding they did have jurisdiction and wanted the work done 
differently.  
 
MrSilver thought it was also an issue of timing because there was a statutory timeline 
for the DEQ to respond to submission of a 381 Work Plan, which was 45 days.  
Once the Plan is in the hands of the DEQ, there was a 45-day window before a 
response would be received.  He commented they wanted the site cleaned up as much 
as the City did, and would like to start the clock running on those government 
agencies as quickly as possible so they could begin the remediation as quickly as 
possible.  
 
MrSilver stated that if the Authority accepted his compromise and accepted the Plan 
subject to the EPA determination, one of the clocks could start running, while the 
other clock was already started, and hopefully get to an end and remediate this 
season.  He noted if they lost the season, it would sit another year and still be a health 
hazard at the site.  
 
MrAnzek reminded the Authority that several questions had been raised by the 
audience that had yet to be addressed.  He noted there had been discussion about the 
last contact with the EPA and the joint conference call on February 112008; and the 
question about what the EPA said about the site.  He noted the question about the 
eastern boundary of the site, and whether the 18 or 19 questions in MrAnderson
Memorandum had been addressed.  He also noted the question about the definition of 
the dust level and what could be used.  He suggested those questions be answered 
prior to any further discussion.  
 
MrDelacourt referred to the hard line edge of the property along the eastern 
boundary, which was the extent of what the developer investigated.  He stated the 
City had already requested cost proposals for the City to consider doing its own 
testing across the property line and what would be involved if remediation was 
necessary.  He indicated that Oakland County had been contacted about the potential 
for grants and that process was being looked into.  He indicated there was a concern 
about how the remediation work proposed by the developer would be done, because 
it was right on the Citys property line and there was some concern about how a 
trench would be dug.  He stated the City was curious from an engineering standpoint 
about how that would work.  He noted that technically that was not a section of the 
381 Work Plan, but was information necessary in order to make an evaluation as to 
whether the Plan was acceptable for the City to submit.  He reminded the Authority 
the 381 Work Plan was the Authoritys Plan, and the Authority submitted it to the 
State; and in fact, the State would not accept a Plan from a developer but it had to 
come from a Brownfield Authority.  He explained that question was being looked into 
and was an outstanding question that would have to be addressed as the matter 
progressed.  He indicated the applicant had only proposed remediation to cut right on 
the edge of the property, which was all the applicant was obligated to do.  The City 
was curious about how that would be graded back to put in the trench wall, which 
was a detail that until the Plan was approved, would require a series of bid documents 
from engineers as to how that would be approved.  He agreed the applicant needed 
some level of assurance the Plan would be acceptable to the City and the DEQ before 
going into that detail.  
 
MrAnderson referred to MrWindschiefs questions regarding the level of PCBs, 
and stated MrWindschief was correct that some of the historic documentation from 
other consultants in the past reflected those numbers.  He stated his firm had split 
samples from the most recent investigation with the applicants consultant, and the 
highest level found was a bit over a 1,000, or about 1,300.  He explained there was a 
lot of variability in this site due to soil chemistry and due to the fact the area had been 
turned upside down.  He stated there were drums there and the site had been 
backfilled over the years, and then all pulled out again when the DEQ did their work 
back in 1999 and 2000.  The soil had been mixed up and turned over, and he was not 
at all surprised a nice contour line could not be drawn from one place to the next.  He 
stated that was part of how the proposed remedy would handle the situation, which 
was to box in all in and cover it up and contain it.  
 
MrAnderson stated he did not agree with MrSilvers interpretation of the 1986 
EPA letter that the EPA handed the site back to the State; otherwise there would not 
have been two other consultants under the auspices of the EPA that were there in 
about 1988 and 1990.  He indicated he was not confident in the outcome of the 
discussions with the EPA, and he did know if the EPA wanted to have jurisdiction or 
not.  He clarified the matter just needed to be done the right way, and if the EPA 
backed off and said it was in the hands of the DEQ, that was the way it would be.  If 
the EPA asserted jurisdiction because they felt there was a risk presented by the 
property, then that was how it would go.  
 
MrDelacourt stated he had some questions related to the EPA jurisdiction.  He 
indicated it was part of his concern that the DEQ had an obligated time frame to 
approve or deny the Plan if submitted; however, the EPA did not have a time frame.  
He questioned if the DEQ approved the Plan, and the EPA took several months 
because of backlog to make a determination because they were not bound by any 
time frame, whether the DEQ would want the EPAs answer first to make a 
determination of whether to approve school tax.  Part of his concern was also that 
there might be a situation where they had an approved DEQ Work Plan, which 
allowed them to move forward with the remediation, prior to the EPA making a 
determination or reviewing the project.  
 
MrSilver stated they would stipulate they would not touch one iota of soil on the site 
until the EPA made its determination.  
 
MrDelacourt stated his other question was that the Consent Judgment said that prior 
to Site Plan Approval, the EPA would approve the 381 Plan.  He did not know how 
that would work if the EPA did not claim jurisdiction, and noted that City Council also 
had to approve it.  He was still trying to get an understanding of what would happen, if 
the DEQ approved the Plan and the work started, and then the EPA and City Council 
denied the Plan.  He noted Staff had no control over when site plans were submitted.  
He felt there was some confusion over the time frame.  He commented they were not 
asking that the EPA approve the 381 Plan prior to submittal to the DEQ, rather just 
render an answer as to whether they had jurisdiction over the site or not.  
 
MrSilver stated the applicant would certainly entertain and be bound by and willing 
to commit that if the DEQ rules before the EPA, they would not start any site 
construction work until the EPA chimed in.  MrStaran thought that could be 
addressed.  
 
Chairperson Stevenson noted the question about the dust control had not been 
addressed.  MrAnderson stated when the 381 Work Plan was submitted to the 
State, the project manager in charge of it will actually hand the Plan to the Air Quality 
Division, which is what was done when the baseline air sampling was done.  The Air 
Quality Division will review it for competency and either agree or disagree with the 
proposal, or may ask for modifications.  He noted it was a pretty comprehensive plan 
that the AKT subcontractor had put together, and did not believe the levels had been 
defined yet, but would come through both the Oakland County Department of Public 
Health and the DEQ.  
2007-0435
 
MrAnthony stated the levels presented in the Plan were the typical levels that the 
DEQ uses for residential property.  He stated the technical number was 550 
micrograms per meter cubed, which essentially meant that at the property boundary 
there would not be visible emissions.  He referred to the photograph on the auditorium 
wall of a golfer in a sand trap, and stated if the golfer could sustain that level for a 
minute, that would shut down the site.  
 
MrAnthony further explained that one minute of the exceedance shut down the site 
and required a ten-minute period of being below the threshold before work on the site 
was allowed to begin again.  
 
MrAnderson stated that from a practical standpoint, the applicant would not want to 
be starting and stopping and would take measures to avoid that.  He referred to Mr
Windschiefs question about whether they were satisfied with the Plan based on Mr
Andersons February 142008 Memorandum and the points set out, and stated his 
response would be a qualified yes.  He explained the applicant had made significant 
strides in the past two weeks coming to the table with assurances of information 
forthcoming that were not required to be installed in the 381 Work Plan.  He noted 
the applicant had added paragraphs and sections that were not required by any means 
as a good faith effort that information was forthcoming.  He stated that typically they 
would not ask for that information to be produced at this point in time, such as the 
engineering design or the dust control plan, which were all eligible expenses that 
consultants can be reimbursed for in the next phase when the project starts.  He 
thought they had done a good job recently in making strides to address his questions.  
 
MrMcGarry referred to the EPA matter, and asked if the EPA decided it had 
jurisdiction, what potentially could change from a technical perspective.  He mentioned 
in the past and with respect to the site across the street, he and others had met with 
MrMatthews from the DEQ.  One of things he knew about this particular site was 
that it was only one of a handful of sites that were this complicated, and this site was 
not an average run-of-the-mill brownfield that was easy for the DEQ to process and 
put through.  He looked at the proximity of the adjacent homes, and in looking at 
other examples of other remediations of very high PCB sites, potentially where PCBs 
could be mixed with other debris and may actually have an opportunity for more 
movement than they would typically have, and asked if other remediations were used 
as a basis for the plan the applicant was proposing for encapsulation.  
 
MrAnthony agreed this site was not a typical brownfield site, and all the technical 
precautions included in the Plan were reflective of that.  He stated his firm had worked 
on a site similar to this located in Bay City, Michigan, which was also a PCB cleanup 
and was an industrial site nested right in the middle of residential.  He stated the 
subject site had a far greater level of safety and scrutiny than the Bay City site had, 
which had similar levels of PCBs.  
 
MrAnthony stated that the technical aspects of the encapsulation were far more 
rigorous than the encapsulation approved for the Bay City site.  The air monitoring is 
to a much higher level than that implemented in Bay City, and noted the cap was the 
same way.  To give an idea of how high the PCBs were at that site, he noted it was an 
old factory for transformers, and in World War II they were experimenting with PCB 
oil in transformers and experimenting with whether they could bury the transformers in 
the ground so they would be protective of bombing raids.  Thus, they ended up with a 
lot of deep, high concentrations of PCBs.  
 
MrAnthony stated the subject did reflect the concern of the residents and the 
response of the City, the developer and the State in putting in as high of technical 
standards for safety, both with air monitoring and construction of encapsulation, as any 
site in the State.  It did reflect the complications present and the Community concern.  
 
MrAnderson noted part of the question was whether there were other examples.  He 
stated there were examples that the EPA had been involved in, although not something 
he had specifically been involved in.  He knew the University of Michigan built a PCB 
contained landfill at Willow Run Airport; Ford Motor Company had done it at their 
Dundee site, and there are other examples where it had been done.  He noted those 
were much more industrial and isolated sites, and did not have a river a couple 1,000 
feet away; homes a couple hundred feet away, a park and a wetland, or a trail where 
pedestrians walk all day long.  He commented those were some of the things that kept 
them very concerned about how things would happen, and thus his long list of 
questions for the applicant.  
 
MrAnderson stated the question had been asked about what the EPA might require 
as far as additions or changes.  He noted that was a difficult topic.  He stated if the 
Toxic Substance Control Act (TSCARules applied completely, they would go into a 
TSCA Remedial Investigation, which was a very burdensome, difficult remedial 
investigation to undertake.  What happened after that was dependant on that phase.  
Where they find the PCBs and at what levels, but was a very tight grid of sampling, 
and the protocols are very stringent.  He stated that was the first thing he would see 
that would change, but so far they have not gone in that direction.  What the EPA has 
asked for is information from the applicant to help the government evaluate the risk 
that may be posed by the site.  While MrSilver was correct in that MrsGreensley 
started out the discussion by saying typically for pre-1978 deposition issue, they 
would recuse themselves from that, speaking on the terms of the EPA.  In cases 
where it was obvious or it can be determined there is a risk to the surrounding 
population and what practitioners would call sensitive receptors, they can insert 
themselves back in to the process.  That was the stage this project was at currently.  
Information has gone to the EPA and he did not know how they would view it as 
much was historic, and they may ask the DEQ for information, and may interview the 
DEQ.  
 
MrAnderson was not necessarily convinced yet whether or not the DEQ will review 
and comment on the Plan without input from the EPA.  He stated he had some 
hypothetical discussions with them about that, but they had not put forth a definitive 
answer.  
 
MrSilver pointed out the DEQ would not have the Plan until the Brownfield 
Authority accepted the plan and submitted it to them.  
 
MrMcGarry referred to the sensitive receptors such as the river and the adjacent 
houses, and asked if there were examples of areas where the EPA made a 
determination that they insert themselves, so the Authority could look at examples of 
their criteria to give them a sense of whether the EPA might be likely to be involved.  
MrAnderson responded not that he was aware of.  He explained he had not run 
across them in this fashion before, noting his involvement had been all post-1978 
deposition issues.  Because of that, TSCA did apply and they asked for certain things 
to happen because they had jurisdiction.  In this particular case, because its a 
brownfield site and in the long run the best thing is to have the site cleaned up in the 
right fashion, it was difficult to figure out where it would go.  
 
MrAnthony stated the site in Bay City was the closest example of a site similar to the 
subject site that he had been involved with.  He noted the Bay City site also had a rails 
to trail that went right over the cap.  In that case, they submitted the work plan to the 
DEQ and then the DEQ contacted the EPA and the EPA waived their jurisdiction on 
the site.  That was also a pre-1978 release.  
 
MrMcGarry stated the packet included a groundwater elevation map and he noticed 
in looking from the west side of the site to the east side of the site, that the 
groundwater elevation, based on the topographical map, declined around 20 feet.  
That suggests there is a relatively high level of water movement within the property or 
within the ground, and asked what had been done in the investigation and in the Plan, 
and in comparison to the Bay City site, to be comfortable and very confident that 
nothing in the encapsulated area is actually going to migrate to the river, based on the 
water level and proximity.  
 
MrAnthony stated the Bay City site was a bit different in the aspect of technically 
they needed to assess the potential for migration to a surface water body.  In that case 
they had both combined storm sewer and storm drains because Bay City is an old city 
and was still separating out their CSOs, which then discharged directly to the 
Saginaw River.  He stated for those who were familiar with Bay City and the Saginaw 
River, they were very sensitive about PCBs being deposited there.  They went through 
quite a bit of investigation to determine if there was any groundwater contact with the 
storm water and if there was migration through any of the utilities that discharged into 
the Saginaw River.  He stated that did end up entailing the cleanup of sediments in the 
utilities there, where that was the pathway.  He explained they have also done that 
analysis on the subject site, i.e., what is the risk of PCBs migrating through 
groundwater to a surface water body.  
 
MrAnthony noted that, in fact, some of the information they just forwarded to the 
EPA was that in 1990 was the first real round of groundwater monitoring where they 
looked at PCBs, and PCBs were not detected in groundwater.  Then the next episode 
came in 1994 and again there were no PCBs in groundwater.  In 2000, they collected 
two events of groundwater samples, put in new wells, resampled those, noting some 
of the wells were in the fenced area where the PCB concentrations are the highest.  
Again, no PCBs in the groundwater.  Part of the reason why is that PCBs are a very 
large, organic molecule.  He used the analogy, if you get oil on your hands and it sticks 
and is hard to wash off, PCB is a large molecule and it sticks onto sediment, and 
sticks on to the soil grains.  Those become fixed and grains are less likely to migrate, 
which is partly why they are seeing the PCBs are immobile.  
 
MrAnthony stated their solution or remedy went further.  He indicated that what 
contributed to migration of contaminants from soil grains, and what contributed to the 
potential of leaching, was infiltration.  Rainwater comes down, collects on the ground, 
infiltrates through the soil, infiltrates through the contaminated material, and tries to 
leach that material off to carry it to groundwater.  He explained the absorption bond 
with PCBs appeared to be very strong here and they had not seen over many years 
that the PCBs were migrating to water.  But to go even further, is the encapsulation in 
clay.  A low permeable material with a cover not only a clay cover, but with an 
FML.  He explained FML is the acronym for the type of material that the plastic sheet 
is made from.  He stated it was not cloth, but was a very thick plastic material, which 
also controlled infiltration and prevents the contact of water with the contaminated 
material.  He noted they have been taking steps to address the migration pathway.  
 
MrAnderson stated that in order to provide some visualization, flexible membrane 
liner (FMLis not as thick as an old 33 rpm record, but was pretty close.  It was not 
rigid, but was flexible, and their proposal is to seam weld it together.  He stated this 
was a material that the EPA required, not recommends but requires, for landfill 
construction.  He indicated it was a liner material and a cap material.  In this particular 
case, because it was not practical to dig down to the depth and line underneath, they 
are lining on top and surrounding with the clay material two feet of compacted clay 
on the four walls, the top, the flexible liner, and then either concrete or asphalt in that 
area on top which is the proposal at this point.  
 
MsMorita asked how the matter was noticed.  She stated the Agenda she received 
indicated the Authority was here to receive an update, but did not mention approving 
the Plan.  She asked if the Authority could approve the Plan the way it was noticed.  
She was not sure the neighbors in the adjacent subdivision had been put on notice that 
the Plan was up for approval.  
 
MrStaran stated there was nothing that prevented the Authority from taking action at 
this meeting, although he thought it was anticipated that the Authority would not for all 
the reasons discussed, such as the EPA issue.  Rather the Authority would hear the 
update, ask questions, discuss it and not take any action to move the Plan forward.  
He was not aware there was a concern or an issue that people did not understand or 
were not notified, and stated if that was a concern of the Authority, it was an 
important concern
 
MsMorita stated she sat on the Authority and she did not understand that.  Mr
Staran stated that City Council and the City had promised the neighbors that it would 
be a public process and they would be made aware of what was going on.  He agreed 
it was not listed as an action item, but there were some actions the Authority could 
take, which had been discussed earlier in the meeting.  
 
MsMorita stated MrSilver made the statement that under the Consent Judgment the 
Authority is required to approve an administratively complete plan.  She stated she 
read the Consent Judgment and asked where that language could be found.  
 
MrStaran stated he had addressed that earlier, but believed the language MrSilver 
referred to was on Page 27 of the Consent Judgment, Paragraph (i), which he 
proceeded to read for the benefit of the Authority as follows:  
 
 Plaintiff shall submit an amended 381 Work Plan consistent with the 
 requirements of this Consent Judgment to the MDEQ and will submit the same 
 to the City.  Any amendment to the Brownfield Redevelopment Plan will 
 incorporate additional costs as needed to meet the terms and intent of this 
 Consent Judgment.  The City will approve the Brownfield Plans if they comply 
 with all the requirements of this Consent Judgment.  The 381 Work Plans 
 must be accepted by the City, which acceptance will not be delayed or 
 unreasonably withheld, and approved by the MDEQ prior to Plaintiff
 receiving Site Plan Approval.”  
 
MrStaran stated that was the only paragraph that spoke to the approval process 
itself in the Consent Judgment.  
 
MsMorita asked if it was MrStarans belief that the matter was noticed for action.  
MrStaran stated it was not noticed for action, but was noticed as an update.  
 
MsMorita asked if it would be appropriate for the Authority to take action at this 
meeting.  MrStaran stated if there was a concern that residents had misunderstood 
the notice, he would agree it would be inappropriate to take action.  
 
MsMorita stated in terms of compliance with the Consent Judgment, one of the 
issues was the location of any above ground water retention.  She asked if the way the 
Plan was presented with an undefined area of above ground water retention is in 
compliance with the Consent Judgment.  
 
MrStaran stated it could be, but it was premature to answer that question because 
there was a lot of engineering and other things that had to take place that had not even 
started yet.  As far as the storm water drainage system, it was his understanding there 
had been some preliminary talks but they had not gotten in to the detail of that.  He 
stated there was a provision in the Consent Judgment that addressed that precise 
question.  He referred to Page 11 of the Consent Judgment, the last paragraph that 
discusses the 100-foot buffer area on the north side of the site that extends the whole 
site from Adams Road to the eastern boundary.  He stated the Consent Judgment 
provides that the Plaintiff may use the 100-foot buffer area for any under ground storm 
water detention/retention facilities providing it does not interfere with the required 
landscaping.  He noted the Consent Judgment said
 
 If any above ground detention/retention is necessary in the 100-foot buffer 
 area, Plaintiffs will locate such detention/retention as far east on the property 
 as practically possible so as to keep the detention/retention area away from 
 the residential homes to the north.  In no event shall above ground 
 detention/retention be permitted directly abutting any of the existing residential 
 home.”  
 
MrStaran stated that in an earlier version of the conceptual site plan, there was a 
rather large above ground retention facility that was to be located adjacent to the 
easternmost homes.  He stated that was something that was found to be objectionable 
by the City based primarily on the neighbors’ comments, and it was something that 
they went back to the negotiation table to work through that.  He stated that was 
where the concept for primarily an under ground drainage system which would also 
have the environmental benefits as well, and to try to eliminate the above ground 
detention/retention either altogether or to minimize it.  Through some preliminary 
review of the concept site plan, the City Engineers did look at it and did think there 
may still be some need for an above ground facility, simply because the drainage had 
to be put somewhere.  It was thought if they had to have it, it should be located as far 
to the east and away from the homes, which is how the language came to be in the 
Consent Judgment.  He noted MrAnthony had pointed out it would serve basically 
as a sedimentation basin function.  He reminded the Authority that at this time it was 
very preliminary and had not been engineered to the point where anything was certain 
about it.  
 
MsMorita stated she understood that, but from what she understand, if the 
applicants Work Plan is in compliance with the Consent Judgment, the Authority was 
required to approve the Work Plan.  She stated her question was the Work Plan was 
now providing for above ground water retention, when they had no specifics on where 
it is, and there were all the qualifiers as to where it could be located, if they knew 
whether or not the Plan was in compliance.  
 
MrDelacourt stated Staff learned last Friday about the split between under ground 
and above ground, and had not reviewed the plan regarding that.  He stated Staff had 
talked to the applicant about submitting an engineering plan to see what it was and 
also because it was identified in the Plan as an eligible activity, but when the packet 
was sent to the Authority, Staff was under the assumption it was a full underground 
system.  
 
MsMorita stated that the Authority would not be required to approve the Plan 
because they did not know whether or not it was in compliance with the Consent 
Judgment.  
 
MrDelacourt stated the Authority could handle that through a condition.  MrStaran 
agreed the Authority could handle it through a condition.  He noted that MrDelacourt 
and MrAnderson had both stated there had been a lot of information going back and 
forth, including some revisions and input that was received as recently as yesterday, 
and Staff had not carefully reviewed that information yet.  He noted they had seen it, 
they knew what it was, and it appears to be an attempt to address questions that had 
come up, but it has not been fully analyzed.  He commented the drainage was at a 
very early stage and had not been reviewed by the City Engineers yet.  
 
MsMorita stated that basically the Authority did not have enough information.  Mr
Delacourt referred to the prior discussion about the sections of the 381 all being 
included in the Work Plan, but Staff still had more questions about how the items 
would be accomplished and other issues they feel are reasonable to review prior to 
submittal to the DEQ.   
 
MrStaran stated that the precise layout of the storm system would probably not be 
determined until Site Plan Approval, and even after that through the construction plan 
review and approval.  He noted that was more of a final step rather than a first step.  
 
MsMorita asked if expenditures for the system were included in the Plan.  Mr
Delacourt stated that was concern of Staff because of the costs associated with some 
of the underground portion, and he believed the liner with the above ground portion, 
are included in the Plan as eligible activities.  
 
MsMorita clarified the Authority was expected to approve a plan for the water 
retention system, noting the Plan included giving the applicants funds to build it, but 
they did not know what it would look like, where it would be located, and did not 
have any specifics.  She asked if the applicant could give the Authority some specifics 
about where it would be and what it would look like.  
 
MrHenderson stated MrStaran was exactly accurate.  He explained that storm 
water came after site plan because there were pipes in the ground, and there were 
variations of where the buildings would go, but the engineers do calculate based on the 
square footage and the area that would be drained, they would know how many cubic 
yards of water would run off the property.  By that calculation, they can identify what 
the cost will be to build above ground or below ground with a bottom to the storm 
detention, a vault system or an open system.  He explained this was designed for a 
bottom, enclosed vault system, and the open area they planned to comply with the 
Consent Judgment to put it as far east as possible where it does not address the 
homes.  They felt they were compliant with that.  He referred to the part that may 
become an above ground area, and noted MrAnderson had suggested to him earlier 
today that he had information that may allow that to go below ground at a lesser cost.  
He noted that was not a detention, but was merely a sediment basin to grab free 
particles so they did not go into the river system or in to any other runoff areas.  It was 
not a large pond, but was a very small area that was merely called a sediment basin.  
 
MsMorita asked if the applicant could provide a dimension of what they considered 
to be a very small area.  MrHenderson stated he was not qualified to state that.  He 
explained that with respect to the under ground storm water detention, he had seen 
sizes of different vault systems, such as cubic feet, but noted those were placed 
underneath the parking areas and were adjustable.  He explained they could not 
design the system prior to Site Plan Approval as it was not a process that was done.  
He stated all the Authority could see were the attributable costs for the amount of 
storm water they would maintain.  
 
MrSilver agreed that to do otherwise would be presume Site Plan Approval for the 
location of something, which they did not have.  
 
MsMorita asked MrAnthony if in his experience he had an idea of how big the 
detention/retention pond would be.  MrAnthony responded that the storm water 
detention system had been designed by another civil engineer that was part of their 
team, PEA (Professional Engineering Associates, Inc.), and they would be the 
appropriate firm to answer the question.  He noted they had seen some conceptual 
drawings for the plan, but it would not be appropriate for him to answer.  
 
MsMorita asked if the applicant came back next month and the Authority was faced 
with having to approve the Plan, if it would be possible to provide more details.  
 
MrSilver stated that if it was going to be the pleasure of the Authority to adjourn the 
meeting without action, he would request a special meeting at the earliest possible 
convenience.  He noted they needed to move the project forward.  
 
MsMorita stated she would like an answer to her question.  MrSilver noted Ms
Morita had included the phrase come back in a month” in her question, and he was 
not necessarily allowed to commit to a month
 
MsMorita asked if the next time the applicant came back before the Authority, they 
could provide more detail.  
 
MrHenderson stated it was premature because it was an engineering design after the 
site plan was done.  He noted if the Authority wanted approximates that would be 
flexible just to satisfy a picture, such as is it a quarter-acre or it is 25’ 25, they could 
accomplish that request, but it would not be the final solution.  He indicated they did 
intend on honoring the Consent Judgment and locating it, if it is required, in the area 
stipulated in the Consent Judgment.  Because of that, he did not understand why it 
was a pertinent issue.   
 
MsMorita stated she knew the neighbors in the adjacent neighborhood and she 
knew they were very concerned about the water retention system, as it was one of the 
biggest issues.  She expected them to have a lot of questions and she was trying to 
help the project move along.  She stated she wanted the project to succeed, and she 
wanted her neighbors to get the answers they would be asking.  She did not want 
them to walk out of the meeting frustrated because they felt the applicant had 
information they were not sharing.  She stated if it was just an approximation of where 
it was located, and how big it would be, that would be better than giving them nothing 
at all.  She commented they had to live next to it and would be the neighbors to the 
property for a long time.  In this case, she thought a little bit of information about what 
they were planning would go a long way toward showing good faith.  
 
MrHenderson thought they had shown a lot of good faith.  MsMorita stated she 
thought they had too.  MrHenderson stated they had met with the neighbors two and 
a half years ago before MsMorita moved to the neighborhood.  
 
MsMorita stated the Plan mentioned that they were expecting odors to come from 
Area E during excavation, and asked what type of odors were expected.  
 
MrAnthony stated the odors may range from a smell similar to a rotten egg smell, 
which was typical of decaying organic matter and was most common with excavating 
old landfills.  
 
MsMorita asked if they were dangerous.  MrAnthony stated the rotten egg smell 
was sulfur which human noses had an acute sensitivity to and can sense that at a 
concentration that is well below any dangerous level.  He responded the odors no
but noted they had all sorts of monitoring put in place, both with the dust/air 
monitoring, and then directly at the point of excavation or point of release where they 
would be screening for VOCs.  He explained that just because a chemical had an 
odor did not necessarily mean it was a hazard or not a hazard.  He stated the other 
methods they were using for screening and monitoring air did look at what types of 
materials are causing those odors, or what types of materials are being released.  He 
commented that odors were really characterized more as a nuisance than a health 
hazard.  
 
MsMorita asked if they were expecting any of the odors to be a health hazard.  Mr
Anthony responded he would not expect the odors to be a health hazard, but they will 
be able to take precautions for odors if they do have odors.  He explained they were 
also trying to minimize any disturbance or inconvenience to the residents that are 
nearby.  He further explained that the odors they would see as a nuisance, but would 
also take precautions to control those
 
MsMorita asked if the was a possibility there could be fumes that could not be 
smelled that could be dangerous.  MrAnthony explained that was the reason they 
had the other types of air monitoring out there.  For instance, just in screening VOCs, 
there may be volatile organics that cannot be smelled, but can be picked up through 
the air monitoring.  
 
MsMorita stated there had been discussions at prior meetings about emergency 
response coordination, and asked if that had been worked on with the City.  Mr
Anthony stated that emergency response is always standard practice with any health 
and safety plan, and health and safety plans are standard for these types of projects.  
 
MsMorita asked if the applicant had been working with a plan with the City.  Mr
Delacourt stated that the applicant had provided maps as part of the 318 Work Plan 
to the City to provide the Fire Department an idea of what area they would be 
working in at what time, and what the Fire Department could expect to come across if 
they were called to the site.  He explained that was done as part of the previous 381 
Work Plan and have continued to do so, which was outside of what they would 
normally be required to do.  
 
MsMorita stated she understand the applicant was not planning to do anything in 
Area B.  The applicant responded that was correct.  MsMorita asked if Area B 
would be left as it is.  MrAnthony stated that from an environmental standpoint, it 
would remain as is.  Due to the development, there would be grading and landscaping.  
MrAnderson stated that from an environmental standpoint, they would not have any 
cleanup activity in Area B, however, from a construction standpoint, there would be 
grading and new landscaping.  
 
MsMorita asked if the developer would be working with the residents adjacent to 
Area B to work out when the landscaping would be done after the cleanup.  Mr
Henderson responded yes.  
 
MsMorita stated she had noticed that methane was being emitted from Area E, and 
asked MrAnderson if it was correct that nothing traveled downhill or uphill or if it 
was indeterminate.  MrAnderson stated that methane tended to defy logic and 
gravity at different times, noting it was affected by atmospheric pressure, water and a 
variety of other structures that would confound the imagination.  He noted it did not 
follow any particular set pattern.  
 
MsMorita asked how far methane could travel and still be dangerous.  Mr
Anderson stated it depended on the original concentration of the source.  At times it 
can be degraded very easily by microbes in the soil and may never get very far.  It can 
be intercepted by utility structures, roadbeds, things like that that would divert it from 
ever coming into play.  
 
MsMorita asked if there was anything in the Work Plan that would divert the 
methane from going to the homes to the north.  MrAnderson responded, yes, the 
encapsulation system itself.  
 
MsMorita asked if the encapsulation system was sufficient, why there would be 
monitoring at two buildings.  MrAnderson stated they were not monitoring, they 
were installing what was called a presumptive remedy” that just in case anything were 
to happen, if there was methane ever generated in the subsurface from that general 
geographic area, or perhaps to the south, if it found a pathway through, those buildings 
would be protected.  
 
MrAnthony added that it was consistent with the DEQ guidelines as those were the 
buildings within 500 feet.  He explained that methane came from the degradation or 
organic material, and a lot of organic material is deposited in landfills.  He stated in 
looking at the area they were removing, and the tremendous amount of mass of 
potential methane generating material that will be gone, and that a methane survey was 
conducted across the site, and there were only two hits of methane in the fenced area, 
the site is very localized and the material that can generate methane will be removed, 
and where it is not, it will be encapsulated.  He pointed out there were a great many 
steps of safety that are put in place.  
 
MrKaras referred to Page 25 of the Consent Judgment, Section D, and asked if the 
applicant could provide some evidence of their contact with the DEQ.  MrSilver 
stated they had met with the DEQ and they approved the initial 381 Work Plan for the 
investigation of the methane, and they had been provided with all the results.  He 
explained that was taken care of in the initial investigation.  He stated the DEQ had 
told them exactly where and what they wanted to test for.  
 
MrKaras asked if the City had a copy of the DEQ letter with their instructions.  Mr
Silver stated there was additional money built into the 381 Work Plan for more 
methane investigations, if the DEQ thought it was necessary based on the initial 
rounds, and the DEQ told them not to spend it.  
 
 
2007-0435
 
MrAnderson stated that was his understanding as well.  Historically, that was exactly 
how things happened.  He explained that the DEQ typically did not issue any type of 
formal communication letter saying the applicant did not have to finish the task, they 
handle that administratively.  He stated it would be atypical for the City to expect 
some formal communication from the State on that matter.  He noted they had 
signified that no additional investigation was necessary at this time with respect to 
methane.  He stated that was communicated verbally to the applicant, and they had 
followed up with him as well.  
 
MrMcGarry referred to the detention and the storm water, and commented it was 
mentioned about the opportunity for children to be playing near it as a potential issue.  
He agreed many of the residents were concerned about that.  He did not feel the 
Authority should take any action at this meeting because they needed to be sure the 
residents had an opportunity to comment.  
 
MrMcGarry referred to the discussion about the detention bin, and asked in terms of 
a fully underground system versus a partial underground with a retention bin, if there 
were significant technical hurdles that relate to specific kinds of sites, or whether it was 
specifically a cost issue, or what determined the decision criteria.  
 
MrAnthony responded that in looking at the site as if it were clean, they would go 
with everything above ground.  One of the reasons they moved to take the bulk of the 
storage below ground was because of the concerns of the citizens.  With respect to 
the technical aspects of building a below ground system, typically they build below 
ground systems which are large vaults that also can infiltrate.  This one is a little bit 
more complicated in that it prevents infiltration, and has to be able to hold the volume 
of water calculated needed for the site, and yet not allow it to infiltrate, which requires 
more storage capacity.  He commented that this site, being a brownfield site, does 
require more twists to it.  Putting the system below ground was in response to citizen 
concern of their being a storm water retention system.  He noted the bulk of the 
volume of storage is storm water storage.  
 
MrMcGarry asked, in terms of removal of the sedimentation, if there was a way to 
do that underground as well, cost effectively, so that there would be an entirely 
underground system.  MrHenderson stated MrAnderson had pointed out earlier in 
the evening that he knew of a system that would enclose that last portion of the storm 
system called the sediment basin, which he felt would be less expensive than what they 
had proposed.  He stated they would look at that and see if they could put the entire 
system as an enclosed system.  
 
MrMcGarry thought that would be good because of the potential for children to be 
playing in the area.  
 
MrSilver addressed the Chair, and noted for the record that they did not ask for an 
informational meeting, but had asked for a meeting that would take action, so they 
could move forward with the DEQ.  
 
Chairperson Stevenson stated that was not presented to the Authority, but rather this 
meeting was an update.  He noted that particularly in view of the situation with the 
EPA, he did not think the Authority could take action at this meeting.  
 
MrDelacourt stated the applicant did indicate they would like to have the opportunity 
to have the Authority take action; however, he was not aware that titling a matter as 
an update would prevent the Authority from taking action.  He noted he had never run 
into that situation before, or that it would prevent action being taken.  He stated Staff 
understood the request from the applicant, even though it was Staffs recommendation 
that until some of the issues were addressed and additional information provided, the 
Authority withhold action.  The wording on the Agenda was not intended to prevent 
the Authority, if it so desired, from taking action, either conditionally or accepting and 
submitting the plan to the DEQ.  He reminded the Authority it was not an approval 
situation.  
 
Chairperson Stevenson stated that based on his understanding of the discussion even if 
Staff had said this was an action item, the Authority would not be in a position to vote 
on it.  
 
MrMorita pointed out that if everyones schedule allowed and the notices could be 
sent out, she would be here on a Saturday morning to discuss the matter again to get 
the applicant an approval, if that was what the Authority wanted.  She stated it was 
not her intent to delay this matter, but the applicant should understand there were a lot 
of people concerned about this, and they need to be on notice the Authority would 
approve the Plan.  She did not want to have a firestorm that could be avoided if the 
matter can wait a few days or a week, which is why she brought it up.   
 
MrHenderson stated they would be glad to entertain a special meeting if it could be 
set.  
 
MsMorita stated if it worked with everyones schedule, she did not have a problem 
with it.  She wanted the applicant to be clear it was not her intent to unduly delay the 
project.  She wanted it to go forward, but wanted it to go forward properly.  
 
MrHenderson stated that sometimes the boards they appear in front of do not realize 
that not only city staff, city consultants, the applicant and their consultants had worked 
on something for fourteen months to bring before the board, so they were ready for a 
decision by the time they appeared before the board, and did everything they could to 
lay out the groundwork for a decision.  Hopefully, Staff has informed the Authority 
along the process so that they could make an educated decision at the meeting or at 
the next special meeting.  He stated they were already at the point where they were 
wondering why it has taken this long, although Staff has been wonderful and the 
consultants have been wonderful, they had worked overtime to get everything asked 
for in a timely fashion.  
 
MrMcGarry stated that Staff had commented on the applicants willingness to work 
with them and provide information, and commented that the Authority had received 
their packet information on the Friday before the meeting and also had to work hard 
reviewing the material.  
 
MrTurnbull referred to the area of encapsulation and noted Staff had indicated they 
had requested assistance in identifying the nature and extent of contamination on the 
adjacent City site.  He asked how long the City was willing to wait for that 
information, and what the City was prepared to do to identify the nature and extent of 
contamination on the property line so that a possible remedy could go forth that would 
encapsulate the entire area.  
 
MrDelacourt stated the City was looking in to that matter, and had investigated the 
possibility of perhaps including portions of the City property in the plan, but it did not 
appear that was feasible.  He explained the next step was to go to the County 
regarding potential assessment grants or loans to perform some testing and possibly 
combining of those funds with the subject project, although the County appeared to be 
hesitant to provide any grants or loans for a parcel that is not associated with an 
increase in development because that was what those grant and loan monies were set 
aside for.  He stated STS had provided a phased cost estimate for different levels of 
investigation.  If none of the those options are available for the City Council to 
consider going forward, it was Staffs hope that a way could be found to incorporate 
the two processes together and coordinate them with some cost saving measures.  
Until that is determined, Staff agrees with the applicants proposal.  
 
MrTurnbull asked how long the City was willing to wait, and if all resources are not 
available, if the City was prepared to undertake that matter.  He thought there would 
only be half a remedy if there is encapsulation on one side of the property line, and 
with respect to the residents to the north, they only had half an encapsulation.  He 
noted it was not the applicants responsibility, but it was no less of a problem for the 
residents to the north.  
 
MrDelacourt agreed, and stated the Citys Environmental Oversight and Cleanup 
Technical Review Committee (EOCwas reviewing options regarding the City 
property.  Pending some determination on how it worked out or if it could be 
incorporated, a recommendation would be taken to City Council on how to proceed.  
 
MrMcGarry asked, if there was no determination regarding the Citys property, and 
the Authority approved the work plan and the project moved on, and the EPA did 
whatever they were going to do, and the trenches were being dug to encapsulate the 
applicants site, and while digging down ten feet, it could be seen that the Citys side 
looked just as bad as the applicants site, what would happen.  He asked if it would 
just be a matter of the clay being put in on the applicants side and the job being 
considered complete.  
 
MrSilver stated that would be all the applicant could do.  He explained a way to 
incorporate the Citys property into the Brownfield Plan and allow the capture of 
additional tax dollars had been reviewed, but that could not be done.  From the 
applicants standpoint, they could not cross the property line.  
 
MrMcGarry stated he recognized that, but as a resident of the City that lived close to 
the site, he would think it was a stupid plan.  He felt an outside observer would 
wonder what the City and the developer were doing.  
 
MrAnzek stated the City had looked at the matter for some time, and there were a 
couple indicators there may not be any contaminants there.  He noted there was a 
severe grade elevation, an increase in height, and a tree line with trees estimated to be 
60 to 70 years of age.  He agreed the initial investigation had to be done to verify that, 
which was the first order of business, to find out if there were contaminants on the 
adjacent property.  He did not want to worry about the cost of the investigation not 
being done before the applicant began digging.  
 
MrDelacourt stated that if the City had not done some form of an investigation by 
that point, and it cannot be incorporated in the applicant381 Work Plan, then the 
City would be out there doing some form of investigation in very short order.   
 
MrDelacourt referred to the part of the question about the trenching work being 
done, and if barrels were spotted across the property line, whether it would just be 
filled.  He guessed that would not happen.  At that point the City would be aware 
there was a rather serious issue, and the City would take whatever measures were 
necessary to resolve that situation immediately.  He know from his involvement with 
the Authority, the EOC Committee and City Council, that they would not allow that 
type of problem to be buried and put away.  He guessed it would never get that far 
without the City having some idea whether any type of contamination, either barrels, 
pushed soil, or turned over soil, had crossed over the Citys property line.  He noted 
proposals had been put in place to do that exact testing.  
 
Chairperson Stevenson called for any additional discussion or questions from the 
Authority.  Upon hearing none, he asked if the Authority wanted to make a motion to 
postpone the matter or establish another meeting, or make a motion to accept the Plan 
subject to conditions.  
 
MsMorita stated she would make a motion to request that Staff coordinate with the 
Authority and the applicant to schedule a meeting date prior to one month from this 
meeting so the issue could be addressed earlier than next month.  
 
Chairperson Stevenson called for a second to the proposed motion.  MrTurnbull 
stated he would second the proposed motion on the floor.  
 
MrStaran suggested that if there were things that were to be accomplished, or 
information that the Authority wanted to be presented before the meeting, it should be 
included in the motion.  He noted that would avoid the Authority holding another 
meeting without all the parties being on the same page.  
 
Chairperson Stevenson asked the Authority to list the items or information they would 
like to have prior to the next meeting.  
 
MrMcGarry stated that in looking in the letters provided by MrAnderson from STS 
regarding the Plan there were two pages of open issues, and although some had been 
discussed and cleared up, some additional follow-up about what items remained open 
would be useful.  
 
MsMorita asked for any information the applicant could provide regarding the above 
ground water retention system, so the residents would have an idea of what the 
applicant was considering.  
 
MrStaran suggested the retention information also include the applicant
investigation of the possibility of going below ground with the retention system.  
 
MrSilver wanted the Authority to understand that if the retention system was above 
ground, they could not actually tell the Authority where it would be located on a map 
because they did not have the authority to locate it.  MrStaran stated the Authority 
was just looking for an approximation if that could be done.  MsMorita stated it 
would help keep imaginations from running wild about the size of the system or where 
it would be located.  
 
MrSilver explained it had to be located on the portion of the property that has no 
home adjacent to it because that was the lowest portion of the property.  Therefore, it 
had to be in the northeastern-most portion of the property because of the topography.  
He stated they would provide that information.  
 
MrKaras stated he would like to see some additional information about the 
encapsulation, and a revised map that clearly defined Areas A through F, as the 
locations currently shown were on several different maps.  
 
MrAnthony stated that there were details in the Work Plan about the encapsulation 
regarding its permeability and geotechnical testing before installation of no more than 
two lifts with arbitrary compaction.  
 
MrWebber requested information about the EPA issue, noting it was something that 
had been discussed and the Authority would like to know about.  MrSilver assured 
the Authority that the minute he heard from the EPA, the City would know.  He again 
reiterated the applicant was requesting a vote on the Plan at the next meeting, 
regardless of whether the EPA had responded.  He indicated he would put as much 
pressure on the EPA as he could to get an answer before the next meeting.  
 
MrAnzek wanted to assure the Board that the next meeting notice would have the 
appropriate language on it for a consideration of action.  He stated it would be sent 
per City policy to everyone who had attended a meeting, spoke at a meeting, or 
expressed an interest in being notified.  
 
MsMorita requested that notice be provided to the thirteen adjacent homeowners 
who resided on Portage Trail because she did not believe they had been notified about 
the meeting.  
 
MrAnzek stated if those residents had spoken at previous meetings, they would be 
included on the master mailing list for the project.  He commented that it was difficult 
for the City to determine which subdivisions should be noticed in their entirety.  
 
MrMcGarry thought there were many residents in the Clinton River Valley 
Subdivision that were interested in this project.  He commented that knowing the 
general prevailing winds were to the northeast, he would not have a problem having 
the Heritage Oaks Subdivision noticed.  He indicated he would notify his subdivision.  
 
MrDelacourt stated the City has always noticed in conformance with the 
requirements for a project.  He explained there was no foot or distance notice 
requirement for the subject project.  He stated for Staff to independently make up 
notice requirements that do not exist became very dangerous for the City.  He noted 
the City did its best to get the word out and meetings noticed, and by policy noticed 
everyone who spoke at a previous meeting.  He indicated that for Staff to make 
indiscriminate determinations when a notice distance is not required by either an Act 
or a policy was avoided and that Staff noticed based on the requirements of a 
300-foot mailing as required by the Act, or based on the City policy of anyone who 
spoke at a prior meeting or indicated they would like to be noticed.  He commented 
that if Staff decided on the fly whether street by street, or subdivision by subdivision, a 
notice should be sent, would result in the next street over questioning why they were 
not noticed.  
 
Chairperson Stevenson noted it was public information that the Authority met on the 
third Thursday of each month, and notice was provided for any special meetings.  
 
MrAnzek asked MrMcGarry to provide him with the name of the president of the 
homeowners association for his subdivision, so a notice could be sent to that person.  
MrMcGarry responded he was the president of that association.  MrAnzek advised 
MrMcGarry the City could provide him with additional copies of the notice for 
distribution in his subdivision.  
 
Chairperson Stevenson called for any further discussion on the motion on the floor.  
He reminded the Authority that the motion had been made by MsMorita, seconded 
by MrTurnbull, to reschedule this Agenda Item for a special meeting with a request 
for additional information to be provided.  Upon hearing no further discussion, he 
called for a voice vote.  
A motion was made by Morita, seconded by Turnbull, that this matter be 
Postponed.   The motion CARRIED by the following vote:
Aye
White, Karas, Stevenson, McGarry, Turnbull, Webber and Morita
7 - 
RESOLVED in the matter of File No03-013, the NE Corner Hamlin/Adams Project, that 
the Rochester Hills Brownfield Redevelopment Authority requests that this matter be 
POSTPONED and also requests that Staff coordinate with the Authority members and the 
applicant to select a meeting date prior to one month from now to address this matter 
again.  
 
FURTHER RESOLVED, the Authority requests that the following information be provided 
prior to the meeting being scheduled:  
 
1.     Additional follow-up regarding the issues outlined in the review letter from Jim 
Anderson, STS, dated February 142008, identifying whether the items listed have or have 
not been addressed.  
 
2.     Information on the applicants plan regarding the above ground water retention system 
to allow the residents to understand what is being considered.  
 
3.     Information regarding the applicants investigation about the possibility of installing 
below ground retention on the site, with an approximate location.  
 
4.     A revised map clearly defining the areas described in the 318 Work Plan as Areas A, 
B, C, D, E and F.  
 
5.     A determination of whether the Environmental Protection Agency (EPAwill consider 
potential jurisdiction regarding the remediation of the site.
2007-0435
 
Chairperson Stevenson noted for the record that the motion had carried unanimously.  
ANY OTHER BUSINESS
8.
Chairperson Stevenson called for any other business.  No other business was 
presented.  
ADJOURNMENT
9.
Chairperson Stevenson stated that the next regular meeting of the Authority was 
scheduled for Thursday, March 202008.  He then called for a motion to adjourn.  
 
Upon a MOTION made by Webber, seconded by White, Chairperson Stevenson 
declared the Regular Meeting adjourned at 9:13 PM.  
 
 
 
________________________________________  
Thomas Stevenson, Chairperson
City of Rochester Hills
Brownfield Redevelopment Authority
 
 
 
_______________________________________  
Judy ABialk, Recording Secretary
 
 
 
 
Minutes approved as presented at the March 132008 Brownfield Redevelopment 
Authority Special Meeting.