Title:
|
Request to Approve Changes to Section 4 of the Rochester Hills Engineering Standards to increase the required water quality treatment from 0.5-inches to 1.0-inches and increase the channel protection design criteria from a 1.87-inch to a 2.39-inch rainfall design event.
|