File #: 2022-0563    Version: 1
Type: Policy Status: Passed
File created: 11/23/2022 In control: City Council Regular Meeting
On agenda: Final action: 12/5/2022
Title: Request to Approve Changes to Section 4 of the Rochester Hills Engineering Standards to increase the required water quality treatment from 0.5-inches to 1.0-inches and increase the channel protection design criteria from a 1.87-inch to a 2.39-inch rainfall design event.
Attachments: 1. 120522 Agenda Summary.pdf, 2. Presentation.pdf, 3. Resolution (Draft).pdf

Title

Request to Approve Changes to Section 4 of the Rochester Hills Engineering Standards to increase the required water quality treatment from 0.5-inches to 1.0-inches and increase the channel protection design criteria from a 1.87-inch to a 2.39-inch rainfall design event.

 

Body

Whereas, The Department of Public Services requests Rochester Hills City Council to approve changes to Section 4 of the Rochester Hills Engineering Standards to increase the required water quality treatment from 0.5-inches to 1.0-inches and increase the channel protection design criteria from a 1.87-inch to a 2.39-inch rainfall design event.

 

Resolved, that the Rochester Hills City Council, on behalf of the City of Rochester Hills Department of Public Services, hereby accepts changes to Section 4 of the Rochester Hills Engineering Standards to increase the required water quality treatment from 0.5-inches to 1.0-inches and increase the channel protection design criteria from a 1.87-inch to a 2.39-inch rainfall design event.