title
Request for Site Plan Approval - File No. PSP2023-0009 - to construct a new building for Primrose School, located on the east side of Rochester Rd. and north of Eddington Blvd., zoned R-4 One Family Residential with an FB Flex Business Overlay, Parcel No. 15-23-301-018, Becky Klein, PEA Group, Applicant
Body
Resolved, in the matter of City File No. PSP2023-0009 (Primrose School), the Planning Commission approves the Site Plan, based on plans received by the Planning Department on July 25, 2023, with the following findings and subject to the following conditions.
Findings
1. The site plan and supporting documents demonstrate that all applicable requirements of the Zoning Ordinance, as well as other City Ordinances, standards, and requirements, can be met subject to the conditions noted below.
2. The proposed project will be accessed from the cross connection with Eddington Boulevard and have access to the traffic signal at S. Rochester Road, thereby promoting safety and convenience of vehicular traffic both within the site and on adjoining streets. In addition, the site will also provide additional cross connections with the development to the north.
3. Off-street parking areas have been designed to avoid common traffic problems and promote customer safety.
4. The proposed improvements should have a satisfactory and harmonious relationship with the development on-site as well as existing development in the adjacent vicinity.
5. The proposed development will not have an unreasonably detrimental or injurious effect upon the natural characteristics and features of the site or those of the surrounding area.
6. The location of the stormwater detention basin fencing is appropriate given the proposed use of the site.
Conditions
1. Address all applicable comments from other City departments and outside agency review letters, prior to final approval by staff including all comments noted on the site plans and staff reports contained within the Planning Commission packets (as may be amended by this motion).
2. Provide appropriate planting and maintenance agreements for plantings on City property as may be necessary.
3. Provide a landscaping bond in the amount of $144,147.25 based on the cost estimate for landscaping and irrigation (as adjusted reflecting the updated landscaping plans), plus inspection fees, as further adjusted as necessary by staff prior to temporary grade certification being issued by Engineering.
4. Provide crown moldings on top of the facade as approved by staff.
5. The junipers for the purposes of screening the headlight glare are to be offset to provide enhanced viability of the plantings as approved by staff.